Temperature °C 12.6 14.6 12.7
Conductivity @ 20°c mSm 10.2 308 10.8
Chloride g/m³ 11.9 370 12.9
pH 7.8 8.3 7.7
BOD5 (total) g/m³ - 72 -
BOD5 (carbonaceous filtered) g/m³ <0.5 - <0.5
Ammoniacal nitrogen g/m³N 0.036 230 0.442
Un-ionised ammonia g/m³N 0.0006 13.974 0.0061
Dissolved reactive phosphorus g/m³P 0.021 - 0.094
Suspended solids g/m³ 10 170 12
Turbidity NTU 8.8 76 8.4
Appearance Turbid, brown Turbid, brown Turbid, brown
These results indicated that the dilution rate was
Trustpower Mangorei hydro scheme consent monitoring report - Taranaki Regional Council.
in Tables 1 and 2.
Table 1 Results of stormwater samples obtained from the second skimmer pit at the KA-19/20
wellsite during the monitoring period
Parameter Unit
Consent
limit
27 Feb
2013
15 Mar
2013
05 Apr
2013
02 May
2013
30 May
2013
26 Jun
2013
Hydrocarbons g/m3 15 <0.5 <0.5 <0.5 <0.5 5.2 99
pH pH 6.5 – 8.5 8.8 8.5 8.5 6.9 7.1 7.1
Suspended Solids g/m3 100 <2 <2 <2 72 45 40
page
16
Table 2 Further results of
Irrigation consent monitoring report 2012-13 - Taranaki Regional Council.
relation to emissions to the air.
The companies monitored during the period under review were Downer EDI Works Ltd, Dialog Fitzroy Ltd,
and Katere Surface Coatings Ltd.
The companies hold three resource consents, which include a total of 72 special conditions setting out the
requirements that the companies must satisfy.
The Council’s monitoring during the year under review included 10 inspections and two deposition gauge
surveys.
Overall, the companies assessed in this Lower …
Airport Farm Decision May 2022
Todd Energy Ltd McKee production station consent monitoring report 2017-2018
the proposed crossing, an ‘agreement to cross’.
For such a simple ‘agreement to cross’, (which should not require a signature from either
party), the Maintenance Authority for the crossing cable should forward to the
Maintenance Authority for the crossed cable the following information:
i) A Route Position List (RPL) covering the route of the cable for at least
three times depth of water on both sides of the proposed crossing point
72
page
ICPC Recommendation
Port Industrial Catchments consent monitoring Annual report 2016-2017
Ballance Kapuni consent monitoring report 2016-2017