Your search for '72' returned 878 results.

Annual report 2015-2016

Temperature °C 12.6 14.6 12.7 Conductivity @ 20°c mSm 10.2 308 10.8 Chloride g/m³ 11.9 370 12.9 pH 7.8 8.3 7.7 BOD5 (total) g/m³ - 72 - BOD5 (carbonaceous filtered) g/m³ <0.5 - <0.5 Ammoniacal nitrogen g/m³N 0.036 230 0.442 Un-ionised ammonia g/m³N 0.0006 13.974 0.0061 Dissolved reactive phosphorus g/m³P 0.021 - 0.094 Suspended solids g/m³ 10 170 12 Turbidity NTU 8.8 76 8.4 Appearance Turbid, brown Turbid, brown Turbid, brown These results indicated that the dilution rate was

Annual report 2015-2016

Trustpower Mangorei hydro scheme consent monitoring report - Taranaki Regional Council.

Report 2013-2014

in Tables 1 and 2. Table 1 Results of stormwater samples obtained from the second skimmer pit at the KA-19/20 wellsite during the monitoring period Parameter Unit Consent limit 27 Feb 2013 15 Mar 2013 05 Apr 2013 02 May 2013 30 May 2013 26 Jun 2013 Hydrocarbons g/m3 15 <0.5 <0.5 <0.5 <0.5 5.2 99 pH pH 6.5 – 8.5 8.8 8.5 8.5 6.9 7.1 7.1 Suspended Solids g/m3 100 <2 <2 <2 72 45 40 page 16 Table 2 Further results of

Annual report 2012-2013

Irrigation consent monitoring report 2012-13 - Taranaki Regional Council.

Lower Waiwhakaiho air discharges monitoring 2019-2020

relation to emissions to the air. The companies monitored during the period under review were Downer EDI Works Ltd, Dialog Fitzroy Ltd, and Katere Surface Coatings Ltd. The companies hold three resource consents, which include a total of 72 special conditions setting out the requirements that the companies must satisfy. The Council’s monitoring during the year under review included 10 inspections and two deposition gauge surveys. Overall, the companies assessed in this Lower …

Coastal Plan submissions A-F

the proposed crossing, an ‘agreement to cross’. For such a simple ‘agreement to cross’, (which should not require a signature from either party), the Maintenance Authority for the crossing cable should forward to the Maintenance Authority for the crossed cable the following information: i) A Route Position List (RPL) covering the route of the cable for at least three times depth of water on both sides of the proposed crossing point 72 page ICPC Recommendation

Annual report 2016-2017

Port Industrial Catchments consent monitoring Annual report 2016-2017