Your search for 'rates' returned 2309 results.

Form 400: Excavate, drill, tunnel, disturb, deposit, occupy

(NZTM) 3.4 Legal description of property at site of activity (refer to land title or rates notice) _________________________________________________________________________________ _________________________________________________________________________________ 3.5 Assessment/Valuation number of property (refer to land title or rates notice) _____________________________________________________________________________________________________ 3.6 What is

Trustpower Motukawa hydro consent monitoring 2017-2018

regularly. A backup system allowed the collection of a limited range of critical data, which allowed Trustpower to continue operating the scheme in line with other conditions (e.g. residual flows, race water levels etc.). There was only one occasion when required flow rates were not complied with. This related to a severe weather event resulting in a high race water level but was of short duration (no more than 2.5 hours). Compliance with flushing flow requirements was good with regards to the

Todd Generation Junction Road Power Station Monitoring Programme Annual Report 2020 2021

rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and management including the timely provision of information to Council (such as contingency plans and water take data) in accordance

Annual report 2014-2015

category of mesotrophic to possibly mildly eutrophic (mildly nutrient enriched). However, taking into page account the influence of suspended sediment in this reservoir, and the moderately low chlorophyll levels, the classification is more appropriately mesotrophic. Previous trending of this water quality data over time found a very slow rate of increase in trophic level. An update of the trend report (for the period 1990-2014) has confirmed this very slow, insignificant rate

Ōkato Scheme Asset Management Plan

the Council, which is the body responsible for managing the asset. 1.3 Duration and review of the Plan The duration of the Plan is ten years from the date of formal preparation and acceptance by Council. This Plan has also been prepared with a 30-year time horizon. Maintenance costs and rates are current to June 2020. page Okato Scheme Asset Management Plan 27 August 2020 4 The Plan will be updated, after the proposed capital works are completed and then reviewed

Ōkato Scheme Asset Management Plan

the Council, which is the body responsible for managing the asset. 1.3 Duration and review of the Plan The duration of the Plan is ten years from the date of formal preparation and acceptance by Council. This Plan has also been prepared with a 30-year time horizon. Maintenance costs and rates are current to June 2020. page Okato Scheme Asset Management Plan 27 August 2020 4 The Plan will be updated, after the proposed capital works are completed and then reviewed

Appendices to Jason Savelio Karena Pene's evidence

from the shed wall to reflect the initial horizontal momentum of the discharge, as follows: - Roof-mounted chimney vents in the proposed scenario were represented by three point emission sources located on the roof of each shed with full vertical momentum to reflect the vertical orientation of the vents, as follows:. page · Modelled odour emissions have varied on an hourly basis over the model year at the rates illustrated in section Figure 2 above. Exhaust temperature have assumed to

Fonterra Whareroa consent monitoring 2019-2020

Appendix II Fonterra Whareroa water abstraction: Hydrographs and summary statistics 2019-2020 Appendix III Fonterra Whareroa wastewater constituent mass loads (Annual estimates 2010-2020) List of tables Table 1 Product manufactured at Fonterra annually 3 Table 2 Summary of resource consents held by Fonterra for the Whareroa site 6 Table 3 Summary of abstraction rate data for 2019-2020 11 Table 4 Limits for stormwater composition for each parameter 2019-2020 (consents …

ANZCO Eltham (Riverlands) consent monitoring 2017-2018

abstraction rate, effluent flow rate and composition, receiving water quality, odour at the plant boundaries, effluent loadings and soil and herbage for irrigation areas. The Council undertakes inspections of the plant site and irrigation areas. Monitoring includes effluent quality checks and inter-laboratory comparisons, water quality, air quality and biological monitoring. The Council’s monitoring programmes for the period under review included four inspections, 52 groundwater and 22 surface

Tawhiti Catchment monitoring report 2017-2018

on the stream for the continuous measurement of flow rate and temperature. Silver Fern Farms Ltd (meat processing plant) demonstrated an overall high level of environmental performance. Silver Fern Farms Ltd holds six resource consents, to allow it to maintain a dam in and to take water from the Tawhiti Stream; to discharge to the stream and to land; and to discharge emissions into the air. During the period under review, there were no incidents reported in relation to activities