Your search for 'rates' returned 2336 results.

Summer 2013-2014

multiple correlations are undertaken, there is a chance that some will be found to be significant purely by chance. In order to deal with this potential problem, the Benjamini-Hochberg False Discovery Rate (FDR) method was applied to the results of the Mann-Kendall test. Further justification for this statistical approach can be found in Stark and Fowles (2006). page 8 Figure 1 SEM beach bathing bacteriological survey sites page 9 4. Results

Urenui & Onaero monitoring report 2020-2021

consents for Urenui Beach Camp (2046-3) and Onaero Bay Holiday Park (1389-3) that requires improvement. This rating was influenced by the ongoing exceedances of discharge volume limits from both camps. No adverse effects have been identified in relation to these discharges and NPDC are being pro- active in their efforts to resolve the issues. NPDC demonstrated a high level of administrative performance with resource consents over the same period. For reference, in the 2020-2021 year, consent

2021/2022 schedules of charges

… page 174 Appendix 6: Charging Policies Resource Management Act Charging Policy Schedule of Charges Pursuant to Section 36 of the Resource Management Act 1991 SCHEDULE 1: SCALE OF CHARGES FOR STAFF TIME Rate for processing resource consents and responding to pollution incidents. Rate for all other Council work. Professional staff $97/hr $92/hr Professional/supervisory staff $123/hr $115/hr Managers $178/hr $166/hr Support staff $97/hr $92/hr Directors

Form 221: Drill bore or well

Longitude/Latitude or NZTM): ________________________ Longitude ________________________ Latitude OR ________________________ E ________________________ N (NZTM) 3.4 Legal description of property at site of activity (refer to land title or rates notice) ___________________________________________________________________________________________________ _________________________________________________________________________________ 3.5

Rules 46-51: Groundwater

rate of abstraction shall not exceed 1.5l/s;  The bore shall be located not less than 500m from the sea or adjacent bores;  The well shall be located not less than 25m from the sea or adjacent wells or surface water bodies;  The well or bore shall be located not less than 50m from any effluent treatment pond, septic tank, silage stack or pit. Permitted Taking and use of groundwater (continued) Activity Rule Standards/Terms/Conditions Classification

Subs 411 526 web

Ordinary Meeting to hear submissions on the 2019/2020 Plan - List of Submissions received (526) and scanned copies 1004 page inability to provide certainty over All Blacks fixtures in the regions and the cost to bring such fixtures to Taranaki compared to the benefits of hosting other sporting fixtures (i.e. national secondary schools tournament week) The impact of a substantial rates increase on our aging population and on our District to increase rates for priority

Annual report 2014-2015

Kaponga, or Patea treatment systems on adjacent receiving waters were recorded in late summer-autumn under low flow conditions during the monitoring period (at which time the Waverley system had been desludged with bio-bugs, the Manaia system had been upgraded with the addition of two wetlands, the Kaponga pond subsurface discharge rate was very low and receiving water dilution very high) in early winter under higher flow conditions (when the Patea upgraded ponds system discharged continuously),

Wai-inu Beach monitoring report 2018-2019

consent holders to resource management and, ultimately, through the refinement of methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by STDC, this report also assigns them a rating for their environmental and administrative performance during the period under

Supplier Terms and Conditions

effect on the date the Council approves the Supplier as a New Supplier following receipt of a duly completed and signed ‘Creditors Form’ showing acceptance of these Terms, and will continue in force until terminated. PRICE, INVOICING AND PAYMENT Consideration: In full consideration of the satisfactory provision of the Goods and/or Services, the Council shall remunerate the Supplier in accordance with the rates and prices stipulated in the Purchase Order (Fee). The Council shall

OMV NZ Ltd Pohukura Production Station Annual Report 2021-2022

achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental performance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these