outlet. Dissolved oxygen monitoring was not required within the newly
re-constructed holding pond. A microfloral sample was also collected from the
oxidation pond at the time of the first inspection for semi-quantitative assessment but
these were curtailed at the end of 2012 (see Section 3.5).
2.1.1 Odour surveys
Four odour surveys were carried out during the monitoring period in conjunction with
all site inspections. Odour strength was rated according to the following scale:
0
NPDC landfills consent monitoring report - Taranaki Regional Council.
required within the re-constructed holding pond. A
chlorophyll-a sample was also collected from the oxidation pond at the time of each
inspection for an assessment of the phytoplankton ‘health’ of this pond.
2.1.1 Odour surveys
Four odour surveys were carried out during the monitoring period in conjunction with
all programmed site inspections. Odour strength was rated according to the following
scale:
0 = no noticeable odours
1 = slight occasional wafts
2 = recognisable and
grazing to minimise losses from critical
source areas.
EFFLUENT
16. Ensure the effluent system meets industry specific
Code of Practice or equivalent standard.
17. Have sufficient, suitable storage available for farm
effluent and wastewater.
18. Ensure equipment for spreading effluent and other
organic manures is well maintained and calibrated.
19. Apply effluent to pasture and crops at depths, rates
and times to match plant requirements and minimise
risk to water bodies.
Item 7 - Further Submissions on the Proposed Coastal Plan
Further-submissions-on-the-Proposed-Coastal-Plan
Taranaki climate trends, hazards & extremes - synthesis report (NIWA, 2008).
Freshwater ecological monitoring report 2018-2019
Freshwater ecological monitoring report 2017-2018
Freshwater ecological monitoring report 2016-2017