Mangati Catchment Joint Annual Report 2022-2023

June 2023 by the Taranaki Regional Council (the Council) describing the monitoring programme associated with 14 industries within the catchment of the Mangati Stream, Bell Block. Overall, a good level of environmental performance was achieved by the consent holders in the industrial area of the Mangati Stream catchment. The Mangati catchment has, in the past, been heavily utilised for the disposal of stormwater and wastewaters from a large number of industrial sites. As a consequence of

Todd Energy Ltd Deep Well Injection Annual Report 2022-2023

its subsidiary (the Company) operate a number of wellsites across the Taranaki region including the Tuhua, Pouri, Mangahewa and McKee wellsites, located east of New Plymouth and the Kapuni wellsites, located south of Stratford. Each wellsite contains varying numbers of producing wells and associated production infrastructure. This report for the period July 2022 to June 2023 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) in relation to the

Lower Waiwhakaiho Catchment Annual Report 2022-2023

water supply, hydroelectric power generation, recreational purposes, and waste assimilation. It is also important to the local hapū. Because of the pressure on the river, the Taranaki Regional Council (the Council) adopted a water management plan for the river in September 1991. During the 2022-2023 monitoring period a total of 19 consents were held by the 13 industries monitored under this programme that discharge wastewater, stormwater and/or leachate from the industrial area at Fitzroy,

Roadworks to cause Connector disruption

Contractors will be off the road for Labour Weekend (22 to 26 October) and for the Taranaki Garden Festival (29 October to 7 November), with SH3 re-opened to two lanes as usual. In the event of bad weather, works may take longer than planned. What does this mean for Connector passengers? Southbound travel Due to the detour, the southbound Connector service will not pass through Tariki. Tariki passengers are advised to use the temporary stops in Inglewood or Midhirst. The Inglewood stop will temporarily

AEE Revised 2049-5.0 2050-5.0 2051-5.0 3941-3.0 5426-2.0 5495-2.0 (renewal) - Taranaki By-Products Limited

.................................................................................. 42 List of Tables Table 2-1: Consents held by RDC that will expire in 2019 ............................................................................ 22 Table 2-2: Consents held by TBP with expiry dates between 2023-2029 ................................................. 23 Table 2-3: Key operational requirements stipulated by Discharge Permit 2049-4 .................................. 24 Table 2-4: Compliance Monitoring results from Taranaki Regional Council

Application form CURRENT Part B Water related activities 3277524

applying under  What permitted activity rule and standards are not being complied with and why  What is the activity status of your application Councils preference is the information is provided in the format shown below Consent applied for Regional Plan or NES Regulation Rule/Regulation applying under Activity Status Eg Controlled Permitted Activity Rule/Regulation not complied with and reasons why not met Surface water take for

Fonterra Whareroa Annual Report 2022-2023

discharge of stormwater and sediment to land; the discharge of dairy factory wastewater to the Tasman Sea; the discharge of dairy liquids to land; and the discharge of emissions to air. This report for the period July 2022 to June 2023 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring

Fonterra Kapuni Annual Report 2022-2023

the period July 2022 to June 2023 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities. During the monitoring period, the Company demonstrated a high level of environmental performance and high level of administrative performance.

Irrigation Water Annual Report 2022-2023

implemented by the Taranaki Regional Council (the Council) to assess the environmental and consent compliance performance of irrigation consent holders across the Taranaki region. The assessment covers resource consents held for pastoral, horticultural and golf course irrigation. This is the 20th Annual Report issued by the Council to report on compliance monitoring programmes for consents authorising the abstraction of freshwater for irrigation purposes in Taranaki. During the monitoring