Your search for 'vision mission goals of Taranki Region Council' returned 4810 results.

Taranaki Thoroughbred Racing consent monitoring 2017-2018

2017 to June 2018 by the Taranaki Regional Council (the Council) on the monitoring programme associated with the resource consent held by Taranaki Thoroughbred Racing (TTR). TTR operates a race track and associated facilities on Coronation Avenue, New Plymouth. The site is located within the Te Henui catchment. Consent 7470-1.2 authorises the abstraction of up to 500 m3/day of groundwater from an abstraction bore at the site, at a rate not exceeding 10 L/s. The report includes the results

Annual report 2016-2017

Tangahoe catchment. The Piggery is a breeder grower and finishing operation with up to 5,000 pigs and piglets at any one time, employing between five and six full time staff. This report for the period July 2016 to June 2017 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and

Minutes

page Doc# 1922442-v1 Minutes of the Policy and Planning Committee Meeting of the Taranaki Regional Council, held in the Taranaki Regional Council Chambers, 47 Cloten Road, Stratford, on Tuesday 29 August 2017 at 10.30 am. Members Councillors N W Walker (Committee Chairperson) M P Joyce C L Littlewood D H McIntyre B K Raine C S Williamson D L Lean (ex officio) D N MacLeod (ex officio) Representative Ms E Bailey (Iwi

Groundwater levels monitoring 1989-2013

page State of the Environment Monitoring Groundwater Levels 1989-2013 Technical Report 2014-126 Taranaki Regional Council ISSN:1178-1467 (Online) Private Bag 713 Document: 1543319 (Word) STRATFORD Document: 1556645 (Pdf) March 2016 page page Executive summary Section 35 of the Resource Management Act 1991 (the RMA) requires local

Annual report 2015-2016

grade lactose plant located on Manaia Road at Kapuni, in the Kaupokonui catchment. The plant processes whey and permeate from dairy product manufacture around the North Island. This report for the period July 2015-June 2016 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental performance during the period under review, and the results and environmental effects of the Company’s activities. The Company holds a total

Annual report 2013-2014

operates a drilling waste landfarm located off Rifle Range Road at Hawera. This report for the period July 2013-June 2014 describes the monitoring programme implemented by the Taranaki Regional Council to assess the Company’s environmental performance during the period under review, and the results and environmental effects of the Company’s activities. In 2013-2014 Greymouth Petroleum Acquisition Company Limited achieved a high level of environmental performance in respect of this site. The

Annual report 2016-2017

holders in the Fitzroy area of New Plymouth. The report covers the period July 2016 to June 2017, and is the 24th report for this combined monitoring programme. The Waiwhakaiho River catchment is significant for the Taranaki region. It is used for domestic, agricultural and industrial water supply, hydroelectric power generation, recreational purposes, and waste assimilation. It is also important to the local hapu. Because of the pressure on the river, the Taranaki Regional Council (the

Report 2012-2014

hydraulically fractured and are now producing. This report describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess Todd Energy Limited’s environmental performance in relation to drilling operations at the Mangahewa-C wellsite during the period under review, and the results and environmental effects of Todd Energy Limited’s activities. Todd Energy Limited holds a total of six resource consents for the activities at the Mangahewa-C wellsite, which

Boyd consent monitoring report 2018-2019

2019 by the Taranaki Regional Council (the Council) on the monitoring programme associated with resource consents held by Colin Boyd (hereafter the consent holder) and his subsidiary company, Surrey Road Landfarms Ltd. The consent holder operates two stockpiling facilities, the now former Derby Road stockpiling facility and Surrey Road stockpiling facility; while Surrey Road Landfarms Ltd (the consent holder’s subsidiary company) hold consent for the application of the material to land.

Taranaki tsunami inundation analysis

Tsunami Inundation Analysis Update 2017 Prepared by: Ir. Craig Goodier: Principal Engineer (Modelling) Reviewed by: Ir. Gary Clode: Manager Engineering June 2017 AM 17/08 HBRC Plan Number 4936 © Copyright: Hawke’s Bay Regional Council page page Taranaki Tsunami Inundation Analysis Table of Contents 1 Summary ______________________________________________________ 1 2 Study