Turangi-C hydraulic fracturing report 2016-2017

Table 6 Results of hydraulic fracturing fluid sampling 14 Table 7 Results of hydraulic fracturing return fluid sampling 15 Table 8 Summary of performance for Consent 9418-2 18 List of figures Figure 1 Location map 5 Figure 2 Monitoring sites at the Turangi-C wellsite 8 page 1 1. Introduction 1.1. Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1. Introduction This report outlines and discusses the

Mangahewa C hydraulic fracturing report 2016-2017

GND2360 in relation to the Mangahewa-C fracturing event compared to baseline 16 Table 6 Results of hydraulic fracturing fluid sampling 18 Table 7 results of hydraulic fracturing return fluid sampling 19 Table 8 Summary of performance for consent 7971-2 22 Table 9 Evaluation of environmental performance over time 24 List of figures Figure 1 Location map 5 Figure 2 Groundwater monitoring sites 9 Figure 3 Surface water monitoring sites 10 page

Annual report 2016-2017

STOS Deep Well Injection consent compliance monitoring report.

Annual report 2015-2016

L2 in Lake Rotorangi during the 2015-2016 period 28 Table 23 Phytoplankton found at site L3 in Lake Rotorangi in the 2015-2016 period 30 Table 24 Macroinvertebrate fauna of the Lake Rotorangi benthos at sites L2 and L3 32 Table 25 Aquatic macrophytes recorded in Lake Rotorangi between 1986 and 2015 36 page iv List of figures Figure 1 Aerial location map of Lake Rotorangi water quality sampling sites for 2015-2016 [LRT000300 and LRT000450] 6 Figure 2

Report 2014-2016

figures Figure 1 Location map 7 Figure 2 Current and historical groundwater monitoring sites at Mangahewa-D 10 Figure 3 Location of biomonitoring sites in relation to the Mangahewa-D wellsite 13 page page 1 1. Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report outlines and discusses the results of the monitoring programme implemented by the Taranaki

Annual report 2012-2013

oxidation ponds 15 Figure 3 Aerial location map 15 Figure 4 Riparian plans prepared in the Kurapete Stream catchment to date 20 page 1 1. Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is the Annual Report for the period July 2012 to June 2013 by the Taranaki Regional Council on the monitoring programme associated with a resource consent held by New Plymouth

Biennial report 2012-2014

ANZCO Eltham (Riverlands Eltham) consent monitoring report - Taranaki Regional Council

Monitoring report 2008-2015

composition at representative reef sites around the region which can be used to assess the ‘health’ of the reef environment. Around the Taranaki coastline, particular reefs are regarded as property of particular hapu. Iwi and hapu associations with the six SEM reef sites are outlined in Table 1. page 3 2. Monitoring methodology 2.1 Site location The location of the six SEM rocky shore sites are shown in Table 1 and Figure 1. Table 1 Location of SEM rocky shore