Air monitoring

quality (NES), and requires regional councils to demonstrate that air meets the standard. Taranaki is one of only two regions that has never exceeded the NES air quality guidelines, always falling into the Ministry for the Environment's categories of 'Acceptable' to 'Excellent'. Intensive ongoing air quality monitoring is therefore not required in Taranaki. What do we look for? Since 1991, the Council has gathered air quality data at up to 20 representative sites across the region including urban,

JD Hickman consent monitoring 2019-2020

despite the dry conditions and quite strong wind. There were no odours noted onsite. The truck wash had recently been used and all washings were captured. The sand trap was cloudy in appearance, the level was lower than the drain and this was not discharging. In general the site was tidy and no spills or other issues were noted around the site. Photo 1 Sand trap, 5 March 2020 5 June 2020 An inspection was undertaken in light rain weather conditions. Inspecting officer Richard Corry …

Annual report 2013-2014

conduct a compliance monitoring inspection. It was fine at the time of the inspection with 6.5 mm of rain falling over the previous 48 hours. Monk Rd Site: The discharged wood waste appeared to be very clean and free of unacceptable wastes. The new pond pipe had been connected to the existing pipe that led down to the culvert under Monk Rd. Due to low flow conditions the culvert at Monk Road was only discharging undiluted contaminated spring water (i.e. no freshwater flow was occurring from

Osflo Fertiliser Ltd Annual Report 2023 2024

inspection it was noted that the pedestrian entrances to the shed now had a protected doorway porch to prevent wind and rain from entering the shed. During each inspection a sample of the stream was obtained. The samples were clean and clear with no sheen or odour, iron oxide is naturally present in the stream. There was no discharge from the stormwater system to sample during any of the inspections. At the time of each inspection the Company were operating in compliance with their resource

SH3 Working Group brochure October 2024

were markedly improved on the approach to the Piopio South Passing Lane, and hazardous poplar trees were removed on outside of same curve. Example - Awakino Gorge Guardrail (2006) The guardrail was installed at the location of a number of crashes, and protects the corner for a distance of approximately 400m. There was also some replacement of square kerbing with radial. Mangaotaki Rockfall (2008) Heavy rain triggered a large rock fall on

Operations and Regulatory Committee Agenda November 2022

Rules 35 and 36 of the RFWP do not include any matters of control that expressly allow for the consideration of matters such as those expressed in the NPS-FM objective. Given that the Council can only consider policies that relate to the matters over which the Council has reserved control through the plan itself, the Council is unable to take into account matters that fall outside this scope. In terms of the notification assessment and when deciding whether a person is an affected person, the

Greymouth Petroleum Ltd Southern Sites Annual Report 2022-2023

was potentially leaking, staff advised that this would be investigated in summer. Ngatoro G: the ring drain had been redefined and metal placed alongside it to help filter sediment. Kaimiro Production Station and Ngatoro-A: Heavy, persistent rain and strong winds had proceeded the inspection and it was noted that the stormwater system on both sites was working well. All stormwater was being collected and directed for treatment prior to discharge from the site. The sites were tidy and

Annual report 2012-2013

landfill at Victoria Rd Figure 2 Stratford landfill (shaded in yellow) and sampling locations 2.1 Inspections 27 August 2012 A site visit was made to conduct a compliance monitoring inspection and to take groundwater samples. The weather was fine with 12 mm rain over the previous 24 hours. Large areas of the crown of cap had been sown with grass. The re-grassed area had been fenced off from stock. There were some areas of ponding around the stock troughs and on the

Reconnaissance report on landsliding (GNS Science)

Council (Red lines show council boundaries). page GNS Science Consultancy Report 2015/172 3 Table 1 Average recurrence intervals (ARI) and 48-hr rainfalls for selected rainfall monitoring sites in the Taranaki Regional Council area. Rainfall monitoring sites 48 hr rainfall (mm) ARI (yrs) North Egmont at Visitor's Centre 456 7 Dawson Falls 531.5 15 Kahui Hut 366 8 Mangorei at Reservoir 175.5 7 Hillsborough 187.5