material deposited on the ground in the log and coal
storage areas. When it rains this material washes into the stormwater system, and discharges into the
harbour via the numerous piped outlets (Figure 2). In order to minimise deleterious effects on the receiving
environment, Port Taranaki Ltd (Port Taranaki) have implemented a number of preventative measures since
2012, including upgrading the stormwater treatment system and improving stormwater management
procedures. This work is ongoing, as log
that there may be other chances for Transport Choices funding and Public
Transport opportunities.
• Inflation has had a large impact, with cut backs in place to ensure rate payers are
not having to pay extra. Low cost low risk programmes have been deferred.
• The coastal walkway extension has had all Iwi informed with handover to follow
soon.
• An incident occurred involving a tree falling in Ōakura, resulted in NPDC being
found liable for the damage due to the tree’s position and
STDC Kaponga, Manaia, Pātea, and Waverley wastewater treatment plants consent monitoring report 2018-2019
mornings the two week rain forecast is received from ‘WeatherWatch’, a
professional weather forecasting business.
9.3 The irrigation model is updated using this information and emailed to Uruti.
9.4 The Uruti Site operator records the level in the irrigation pond Monday morning.
9.5 The Site Manager plans the weeks irrigation based on the irrigation pond level, the rain
forecast, and the application rate (rates are attached see Irrigation Areas/Rates). This
information is posted on the
Significant donated assets for which current values are not readily obtainable are not recognised. For an asset to be
sold, the asset is impaired if the market price for an equivalent asset falls below its carrying amount. For an asset to be
used by the Trust, the asset is impaired if the value to the Trust in using the asset falls below the carrying amount of the
asset.
Work in progress is recorded at cost. Cost includes expenditure which is directly attributable to the acquisition
upon receipt of the asset
if the asset has a useful life of 12 months or more, and the current value of the asset is readily obtainable and significant.
Significant donated assets for which current values are not readily obtainable are not recognised. For an asset to be
sold, the asset is impaired if the market price for an equivalent asset falls below its carrying amount. For an asset to be
used by the Trust, the asset is impaired if the value to the Trust in using the asset falls
readily obtainable and significant.
Significant donated assets for which current values are not readily obtainable are not recognised. For an asset to be
sold, the asset is impaired if the market price for an equivalent asset falls below its carrying amount. For an asset to be
used by the Trust, the asset is impaired if the value to the Trust in using the asset falls below the carrying amount of the
asset.
Work in progress is recorded at cost. Cost includes expenditure which is directly
current values are not readily obtainable are not recognised. For an asset to be
sold, the asset is impaired if the market price for an equivalent asset falls below its carrying amount. For an asset to be
used by the Trust, the asset is impaired if the value to the Trust in using the asset falls below the carrying amount of the
asset.
Work in progress is recorded at cost. Cost includes expenditure which is directly attributable to the acquisition of an
asset. Capital work in
appeared that the skimmer pit had recently
discharged, considering the volume of rain that had recently fallen it was likely that the skimmer pit still had
a leak. No effects were noted in the receiving waters downstream of the discharge point.
2.1.2 Results of discharge monitoring
Figure 1 Location of the Cheal Production Station and associated sampling sites
Chemical water quality sampling of the combined discharge from the Cheal Production Station and Cheal-A
wellsite was
was considered that this was due to the
consequences of photosynthetic activity of algae growing in the skimmer pit under
hot, sunny and dry conditions, rather than any chemical source. It was considered by
Council officers that should enough rain fall to cause a discharge, the pH would fall
to well within consent limits prior to any discharge occurring. No remedial action
was required by the Council.
A sample obtained on 26 June 2013 from the second skimmer pit returned elevated
levels