23-11136-1.0 R2/11136-1.0 Robe & Roche Investments Limited 12-Jul-23 New consent
To discharge stormwater from roading surfaces into a
natural inland wetland. Discharge Permit 56 Pohutukawa Place, Bell Block Unnamed catchment 62
23-11137-1.0 R2/11137-1.0 M Hareb Excavating Limited 12-Jul-23 New consent
To discharge farm dairy effluent from a stock effluent
dump site onto land Discharge Permit
112 Tate Road, Waitara and
2 Johnston Street, Waitara Waitara
3218007 (Pdf)
February 2024
page
page
Executive summary
Todd Petroleum Mining Company Ltd (Todd Petroleum) operates the Kapuni Production Station located on
Palmer Road in the Kapuni catchment.
This report for the period July 2022 to June 2023 describes the monitoring programme implemented by the
Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance
performance during the period under review. The
page
Application No. Consent No. Applicant Lodged Date Application Type Description Activity Type Location Catchment
23-11138-1.0 R2/11138-1.0 Greymouth Petroleum Turangi Limited 17-Jul-23 New consent
To temporarily dam and divert water in the Waiau stream
to install pipelines beneath the streambed. Water Permit 121 Turangi Road Upper, Waitara Parahaki
23-06455-2.0 R2/6455-2.0 Riverlands Eltham Limited 18-Jul-23 New consent
To use an existing pipe in an unnamed tributary of the
Executive summary
Todd Petroleum Mining Company Ltd (the Company) operates a gas treatment plant, Kapuni Gas Treatment
Plant (KGTP), located on Palmer Road at Kapuni, in the Kapuni catchment, South Taranaki.
This report for the period July 2022 to June 2023 describes the monitoring programme implemented by the
Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance
performance during the period under review. The report also details the results of the
the old landfill area off Bewley Road showed that all
of the samples collected from the three monitoring bores complied with consent limits.
There were eight unauthorised incidents recorded that were associated with the consents covered by this
report, which resulted in two abatement notices being issued.
During the period under review, AML Ltd demonstrated a good level of environmental and a high level of
administrative performance and compliance, with their resource consent as …
2,800,000 N 100% $ 2,800,000
Pre-implement.
2019/20
(24)
800,000 800,000 1,600,000 N 100% $ 1,600,000
Implementation
2020/21
(36)
1,800,000 1,800,000 - - - - 3,600,000 N 100% $ 3,600,000
NPDC Airport Drive Improvements
Airport Drive roundabout - local road roundabout
servicing Area Q
Local Road
Imprvmts
Implementation
Dependent
on NZTA's
SH3 works
Freshwater recreation survey 2019-2020
Dec 2014 01 Jun 2032 June 2026
Energyworks Ltd
9606-2 discharge to
air
To discharge emissions into the air associated
with abrasive blasting operations, spray painting
and associated activities at a permanent site at
Connett Road East, Bell Block and from mobile
operations throughout the Taranaki region,
including parts of the coastal marine area
20 03 Sep 2020 01 Jun 2038 June 2023
9962-1
discharge
stormwater
to land/water
To discharge stormwater via the New
David Langford NPDC
Richard Buttimore New Plymouth Airport
Peter Ledingham Communications Adviser TRC
Richie Arber NZ Road Carriers Association
Justin Hawkridge Port Taranaki Limited
Kevin Wright NZTA
Ms Junine Stewart NZTA
Marion Webby STDC
Mr R O’Keefe NZ Police
One member of the media, Mr Mike Watson, Taranaki Daily News.
Apologies There were no apologies received.
Notification of There were no late items.
Late Items
The chairman, …
of water returning to the surface that requires subsequent disposal.
1.2.2 The Turangi-B wellsite and hydraulic fracturing activities
The Turangi-B wellsite is located on Turangi Road Upper near Waitara and lies within the Parahaki
catchment. The area surrounding the site is rural in nature and farming and forestry activities co-exist with
active petroleum exploration and production operations. The location of the wellsite is illustrated in
Figure 1. A summary of the hydraulic fracturing