Your search for '72' returned 923 results.

Fonterra Whareroa consent monitoring 2018-2019

350 22.5 0.3 0.3 Median 65 0.5 1.1 11 273 0.25 7.6 8 5.8 15.6 0.05 0.05 Number 137 83 144 141 143 140 143 141 104 140 143 142 2018-2019 monitoring results 16 Aug 2018 60 <1 1.6 <6 263 <4 7.6 6 10.2 12.2 0.13 <0.07 13 Sep 2018 68 <1 1.1 8 306 25 7.4 <8 5.0 13.0 <0.07 <0.07 18 Oct 2018 72 <1 0.9 <6 315 4 7.4 <3 3.0 16.4 <0.07 <0.07 21 Nov 2018 72 <1 1.7 8 300 6 7.7 <3 2.4 16.0 <0.07 <0.07 18 Dec 2018 60 <1 1.0 <6 264 <4 7.2 4 2.7 21.9 0.1 0.08 16 Jan 2019 53 <1

NP Waste Water Treatment Plant consent monitoring 2017-2018

environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of NPDC’s activities. In relation to the operation of the NPWWTP, NPDC holds six resource consents, which include a total of 72 conditions setting out the requirements that NPDC must satisfy. NPDC holds one consent to discharge treated wastewater into the Tasman Sea, one consent to discharge sludge leachate to

Annual report 2016-2017

NPDC former landfills & contingency landfills consent monitoring report 2017-2017.

Annual report 2014-2015

period ending 30 June 2015, there is a total of 136 km of the 139 km of Mangawhero Stream banks (upstream of the Mangawharawhara Stream confluence) adequately fenced and 21 km with riparian vegetation. A further 3 km (fencing) and 10 km (vegetation) have been recommended within riparian farm plans for completion. Correspondingly, 54 km (fencing) and 31 km (vegetated) of the 72 km of Mangawharawhara Stream banks (to the Waingongoro River confluence) are adequately riparian protected with an

Annual report 2012-2013

TAG Oil Vanner landfarm consent monitoring report - Taranaki Regional Council.

Cheal Deep Well Injection Monitoring 2021-2022

injection volume (m3/day) Maximum injection rate (m3/hr) Max. injection pressure (bar) Avg. injection pressure (bar) 2021-2022 217 41 5.1 83.6 1.6 2020-2021 8,062 106 4.5 94.9 30 2019-2020 16,822 144 6.7 75.4 37 2018-2019 31,780 242 10.1 100.4 35 2017-2018 39,981 343 14.3 94.3 25 Deep well injection at Cheal-A via the Cheal-A7 injection well 2021-2022 3,192 44 2.7 103.6 63 2020-2021 8,139 68 6.6 103.6 72 2019-2020 14,115 107 5.2 91.8 71

Annual report 2015-2016

Port area industrial catchments consent monitoring report - Taranaki Regional Council.

Annual report 2014-2015

consent 70 page ii 4. Recommendations 71 Glossary of common terms and abbreviations 72 Bibliography and references 75 Appendix I Resource consents held by Trustpower for the Motukawa HEP Scheme 1 Appendix II Biomonitoring reports 1 page iii List of tables Table 1 Gauging results for gaugings undertaken in relation to the Manganui River residual flow 24 Table 2 Gauging results for gaugings undertaken in relation to the