overall population has continued to increase since 2001 but the rates of growth are nowhere
near what are being experienced in other faster growing regions. So the environment is not under
population-induced pressure.
Like any report card there are positives and negatives. The main conclusions of the report are summarised
on the following pages.
page
1442647 MB Final Draft.
13
Land
Soil is one of Taranaki’s most important resources. Taranaki’s rural-based wealth is
Sport NZ acknowledges that Taranaki Regional Council is only mandated to act in respect
of Rugby Park in New Plymouth, we know that the Council is also aware that any decisions it
makes with regards to the rates it levies has a material impact on the residents of the Region
and therefore on the wider network of community facilities including those relating to sport
and active recreation.
Any decision the Council makes regarding the redevelopment of the Stadium has an
Longitude/Latitude or NZTM):
________________________ Longitude ________________________ Latitude OR
________________________ E ________________________ N (NZTM)
3.4 Legal description of property at site of activity (refer to land title or rates notice)
___________________________________________________________________________________________________
_________________________________________________________________________________
3.5
silty-clay
. Due to high rates of irrigation loading, shallow groundwater beneath the Uruti Composting
Facility Site are moderately impacted with Chloride contamination
. Site layout, hydrogeological interactions, soil types and rainfall also influence the level of
Chlorides observed in the soil, groundwater resources and the Haehanga Stream
environment
. Offsite impacts have not been quantified and where not part of the scope of this report
The Uruti Composting Facility Management Plan was
continuous measurement of flow rate and temperature.
Silver Fern Farms Ltd (meat processing plant) demonstrated an overall high level of environmental
performance.
The Company holds six resource consents, to allow it to maintain a dam in and to take from the Tawhiti
Stream; to discharge to the stream and to land; and to discharge emissions into the air.
During the period under review, there were no incidents reported in relation to activities at the site.
Abstraction volumes complied
refinement of methods
and considered responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by the Company, this
report also assigns them a rating for their environmental and administrative performance during the period
under review.
Environmental performance is concerned with actual or
achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by the Company, this
report also assigns them a rating for their environmental and administrative performance during the period
under review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring
page
Project Risk/Opportunity Management
Description Effect Mitigation Strategy
Risk Rating
(unmitigated)
Actions currently being taken
Lack of a clear strategy
and timeline for
engagement on key
strategic issues.
Engagement in this sense is
the two way discussions
needed to obtain external
stakeholder input on key FW
programme and FW Plan
elements.
Engagement requirements
for FW are significantly
higher than previous TRC
responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental performance
Besides discussing the various details of the performance and extent of compliance by the consent holders,
this report also assigns a rating as to each Company’s environmental and administrative performance during
the period under review. The rating categories are high, good, improvement required and poor for both
environmental and
accordance with State of the
Environment monitoring requirements. The 2013-2014 programme continued to incorporate
these changes. A later consultant’s report (in 2000) re-confirmed trends (using up-dated
methodology) that the lake was phosphorus limited and remained mesotrophic. Further trend
reporting for the period 1990-2006 was provided as a component of the consents renewal
process and suggested that while there has been a very slow rate of increase in trophic level,
the lake would be