page
73
6 Appendices
6.1 Appendix I: Taranaki erosion assessment sites G ibb(1978)
(excel file: #640813)
NZ Map Grid NZTM
Northing Easting Northing Easting Years Rate
123 Patea 6158000 2637600 5596277 1727558 1872-1905 1.82
Patea 1905-1976 -0.85
124 Patea 6158000 2637300 5596277 1727258 1872-1905 -1
Patea 1905-1939 1.74
Patea 1939-1976 2.05
125 Power House Road 6162900 2631500 5601174 1721456 1901-1976 -0.05
upgrading the HEPS generated
output, where an increased in flow below the weir would be a
down grade to the HEPS by reduced generated output!!
Upload submission details here NA
Outcome sought
I seek the following decision from the Council To grant consent
If consent is granted, the conditions I seek are That the residual channel flow down stream of the weir can be
stage reduced from between 180 Liters/ second to 100 Liters/
second,
This base flow rate of 100 Liters/ second would be in
development capacity as they arise.
The removal of minimum parking rates in district plans (Policy 11) seeks to improve
land use flexibility in urban environments. It will allow more housing and
commercial developments, particularly in higher density areas where people do not
necessarily need a car to access jobs, services or amenities. Developers will still
provide car parking in many areas, and must still provide accessible car parking, but
the number of car parks will be driven by market …
Administrative Charges Page 2 Document 2487866
Resource Management Act Charging Policy
Schedule of charges pursuant to section 36 of the Resource Management Act 1991
Schedule 1: Scale of charges for staff time
Rate for processing resource consents and
responding to pollution incidents.
Rate for all other Council work.
Professional staff $95/hr $90/hr
Professional/supervisory staff $120/hr $112/hr
Managers $174/hr $163/hr
Support staff $95/hr $90/hr
Directors $290/hr $270/hr
were also four pipe blockages caused by wet wipes; an occurrence which NPDC believe to be linked to their
increased public use as a result of COVID. The latter is being addressed through a ‘Three Waters’ education
strategy.
During the year, NPDC demonstrated a good level of environmental and administrative performance with
the resource consents relating to NPWWTP operations. This rating reflects the high number of incidents that
occurred at the NPWWTP during 2019-2020. Most of these …
ultimately, through the refinement of methods
and considered responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by the Company, this
report also assigns them a rating for their environmental and administrative performance during the period
under review.
Environmental performance is …
considered responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by the Company, this
report also assigns them a rating for their environmental and administrative performance during the period
under review.
Environmental performance is concerned with actual or likely effects on the …
landscape and visual effects of the proposal in the context of the site and the
wider landscape setting, as well as effects on key public views.
This assessment has been prepared with reference to the NZILA Best Practice Note Landscape Assessment and
Sustainable Management 10.1 in conjunction with Information requirements for the assessment of landscape and
visual effects”2. The effects ratings and definitions used in Table 1 are provided in Appendix B. To determine the
overall nature and
page
Summary
Argentine stem weevil damage to pasture results in:
� lower stocking rates
� more frequent need to resow pasture
� reduced cultivar suitability (some high-performing low
endophyte types are susceptible to ASW)
Animal health problems due to high endophyte include:
� lower weight gains
� lower milk production
� high incidence of dags and fly-strike
Biological control with the parasitoid wasp will in time
reduce ASW numbers. The expected outcome from reduced
ASW
performance and extent of compliance by
the consent holder during the period under review, this report also assigns a rating as
to the Company’s environmental and administrative performance.
Environmental performance is concerned with actual or likely effects on the receiving
environment from the activities during the monitoring year. Administrative
performance is concerned with the Company’s approach to demonstrating consent
compliance in site operations and management including the timely