groundwater table, BTW Company staff
undertook two bore permeability tests on the monitoring bores GND 2188 and GND 2190 (January
8th 2015).
The ‘slug test’ method requires removal of a set amount of water, where after recovery of water
levels is timed with a stopwatch. The four litre ‘slug’ was removed by a high rate vacuum pump,
and the recovering water level was determined with a calibrated electronic dip tape. Both
monitoring bores did not fully recover to their initial water levels after
fenced and retired 12.3 hectares of
grazed land, 12.6 hectares of native bush and 8.5 hectares of
manuka forestry. This involved 2.7 kilometres of fencing.
They’ve also planted 261 poplar poles.
By improving better-producing areas such as river terraces to
increase pasture growth, the Sandfords have maintained their
stocking rate even though the total grazing area has been
reduced.
They regularly control goats, pigs, deer, possums and stoats by
trapping, poisoning
waste and domestic rubbish, was not related to Consent 3769-3. As a result, the
abatement notice did not affect the rating of STDC in relation to environmental
performance of the sewage treatment system at Wai-inu (Consent 3769-3) which was
‘high’ for the 2011-2013 monitoring period.
page
7
Photo 1 Ponding of water on top of the sand filters during the December 2014 inspection
Photo 2 Adjustment of the pump station during the December 2014 inspection
is buffeted by high winds and waves
from the west, and parts of the coastline are eroding significantly. However, the location, severity and rate of
coastal erosion are influenced by factors such as the local geology and orientation of the location, the supply
of sediment to and along the coast, and the influence of artificial structures such as breakwaters and
sea walls.
The effects of climate change such as rising sea levels, wave patterns, storminess, and increased sediment
of consent holders to resource management and, ultimately, through the refinement of methods
and considered responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental and consent performance
Besides discussing the various details of the performance and extent of compliance by the Company, this
report also assigns them a rating for their environmental and administrative performance during the period
Besides discussing the various details of the performance and extent of compliance by
GPL, this report also assigns them a rating for their environmental and administrative
performance during the period under review.
Environmental performance is concerned with actual or likely effects on the receiving
environment from the activities during the monitoring year. Administrative
performance is concerned with GPL’s approach to demonstrating consent compliance
in site operations and management
various details of the performance and extent of compliance by
the consent holder during the period under review, this report also assigns a rating as
to Todd’s environmental and administrative performance.
Environmental performance is concerned with actual or likely effects on the receiving
environment from the activities during the monitoring year. Administrative
performance is concerned with the Company’s approach to demonstrating consent
compliance in site operations and management
meeting allowance rate remains at $80/hr
Five hours prep time for meetings.
Lean/Joyce
10. Participation in Regional Economic Development, Tourism Promotion and Event
Attraction/Promotion Activities
10.1 Mr M J Nield, Director – Corporate Services, spoke to the memorandum to initiate a
discussion on the involvement of the Council in regional economic development,
tourism promotion and event attraction/promotion activities ahead of the inclusion of
any changes in the draft …
Quarterly Operational Report September 2021
extent of compliance by
the consent holder/s during the period under review, this report also assigns a rating
as to each Company’s environmental and administrative performance.
Environmental performance is concerned with actual or likely effects on the receiving
environment from the activities during the monitoring year. Administrative
performance is concerned with the Company’s approach to demonstrating consent
compliance in site operations and management including the timely provision of