Your search for 'rates' returned 2231 results.

Southern Quarries Biennial Report 2020-2022

to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental performance and administrative compliance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and

Operations and Regulatory Committee Agenda February 23 Part 3

SLDP2b Rodent numbers post initial control in 1st extended area (100ha) of Pukeiti are below a 1% tracking card index. 1-May-22 Delayed to July 2023 – suggest change to wording This milestone needs to be reviewed given the difficulty of attaining a 5% tracking card index within the first control area. Suggest change to 5% RTC TRC LSDP4c Self-help Possum control mean catch rate is below a 5%RTC within landscape predator area. 30-May-22 Not

Application Appendix F Hydrology Assessment 20 02053 4 0 + 5 other renewals Trustpower 25 Nov 2020

representing the flow in the river with the generation flow added back in 7. Waiwhakaiho at Rimu St – this is another long-term flow recording station operated by TRC; while river levels have been recorded from October 1992, rated flows are only available from April 2009. Represents flow in the lower river downstream of the scheme 8. Lake Mangamahoe – representing operation of the lake and level fluctuations. Of the eight nodes for which hydrological information is presented in this report, five

Groundwater Quantity State of the Environment Monitoring Triennial Report 2017-2020

adverse effects on the environment. The main method of policy implementation is through the Regional Freshwater Plan for Taranaki (2001) (RFWP), which sets out regional rules to allow, regulate and avoid adverse effects on the environment from the taking and use of groundwater. Under Rule 48 of the RFWP, the taking of groundwater of up 50 m3/day, at a rate not exceeding 1.5 L/s, is permitted, providing several conditions are met. Takes exceeding this volume or rate, or not meeting all …

TRC Technical Memorandum Lakes trophic state 9 August 2023

such as total nitrogen, total phosphorus, ammonia and chlorophyll-a. The spatial water quality attribute models were variable in performance however, with the exception of the ammonia criteria, those utilised for this assessment were rated to have satisfactory to very good performance (Snelder et al. 2022). Caution is advised when interpreting absolute values estimated for specific locations with spatial water quality models, due to the associated uncertainty. Models such as these

Executive Audit and Risk Agenda March 2023

36,746 1,290,135 1,284,546 -5,589 2,128,388 Total operating expenditure 2,472,342 3,036,696 564,354 23,447,621 23,373,492 -74,129 47,004,286 Revenue from exchange transactions Direct charges revenue 968,359 1,252,165 -283,806 2,855,564 3,202,795 -347,231 5,048,875 Rent revenue 80,123 110,000 -29,877 956,407 770,000 186,407 1,260,000 Dividends 0 0 0 4,000,000 4,000,000 0 8,000,000 Revenue from non-exchange transactions General rates

OMV NZ Pohokura Production Station Annual Report 2022-2023

tailored monitoring programmes, while for another 96 (10%) of the consents a good level of environmental performance and compliance was achieved. A further 27 (3%) of consents monitored required improvement in their performance, while the remaining one (<1%) achieved a rating of poor. In terms of overall environmental and compliance performance by the consent holder over the last several years, this report shows that the consent holder’s performance remains at a high level. This report

Manawa Energy Mangorei HEP Scheme Annual Report 2021-2022

responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both

Waihapa Production Station Annual Report 2021-2022

enables the Council to continually re-evaluate its approach and that of consent holders to resource management and, ultimately, through the refinement of methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental performance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s