Your search for 'rates' returned 2335 results.

Greymouth Petroleum Ltd Northern Sites Annual Report 2022-2023

level of environmental performance and compliance was achieved. A further 27 (3%) of consents monitored required improvement in their performance, while the remaining one (<1%) achieved a rating of poor. In terms of overall environmental and compliance performance by the consent holder over the last several years, this report shows that the consent holder’s performance remains at a good level. This report includes recommendations for the 2023-2024 year. page i

Fonterra Kapuni Monitoring Programme Annual Report 2020 2021

levels. This had been addressed through extension of the irrigation disposal system in 2007-2008, and by more intensive wastewater and groundwater monitoring. During the year under review, there was a higher nitrogen load applied to the paddocks than in the 2017-2020 years. The nitrogen application rates increased by about 14% on Farm 1 and 20% on Farms 2 and 3 in the 2019-2020 year, with further increases of 10% on Farm 1, 4% on Farm 2, and 18% on Farm 3 during the year under review. On Farm 3,

STDC Coastal Structure Annual Report 2022-2023

performance and compliance was achieved. A further 27 (3%) of consents monitored required improvement in their performance, while the remaining one (<1%) achieved a rating of poor. In terms of overall environmental and compliance performance by the consent holder over the last several years, this report shows that the consent holder’s performance has improved in the year under review. This report includes recommendations for the 2023-2025 monitoring period. page i

ANZCO Eltham Ltd Annual Report 2021-2022

take and use water, two consents to discharge effluent and stormwater into the Waingongoro River, two consents to discharge effluent and solids to land, two consents for structures in watercourses, and one consent to discharge emissions into the air at the plant site. Monitoring is carried out by both the Company and the Council. The Company monitors water abstraction rate, effluent flow rate and composition, receiving water quality, odour at the plant boundaries, effluent loadings and soil

OMV New Zealand Ltd Maui Production Station Annual Report 2022-2023

monitoring programmes, while for another 96 (10%) of the consents a good level of environmental performance and compliance was achieved. A further 27 (3%) of consents monitored required improvement in their performance, while the remaining one (<1%) achieved a rating of poor. In terms of overall environmental and compliance performance by the consent holder over the last several years, this report shows that the consent holder’s performance remained at a high level. This report includes

Beach Energy Resources Kupe Production Station Annual Report 2022-2023

environmental performance and compliance was achieved. A further 27 (3%) of consents monitored required improvement in their performance, while the remaining one (<1%) achieved a rating of poor. In terms of overall environmental and compliance performance by the consent holder over the last several years, this report shows that the consent holder’s performance remains at a high level. This report includes recommendations for the 2023-2024 year. page i Table of

Mangati Catchment Joint Annual Report 2022-2023

through the Taranaki tailored monitoring programmes, while for another 96 (10%) of the consents, a good level of environmental performance and compliance was achieved. A further 27 (3%) of consents monitored required improvement in their performance, while the remaining one (< 1%) achieved a rating of poor). In terms of overall environmental and compliance performance by the consent holders over the last several years, this report shows that overall the consent holders’ performance at a good

Westside New Zealand Ltd Deep Well Injection Annual Report 2022-2023

For reference, in the 2022-2023 year, consent holders were found to achieve a high level of environmental performance and compliance for 878 (87%) of a total of 1007 consents monitored through the Taranaki tailored monitoring programmes, while for another 96 (10%) of the consents a good level of environmental performance and compliance was achieved. A further 27 (3%) of consents monitored required improvement in their performance, while the remaining one (<1%) achieved a rating of poor.

Ballance Agri Nutrients Kapuni Ltd Annual Report 2021-2022

Inspections 16 2.2.2 Discharge monitoring 17 2.2.2.1 Effluent volume 17 2.2.2.2 Nitrogen application rates 17 2.2.3 Soil and herbage monitoring 18 2.2.3.1 Spring 2022 soil and herbage survey 19 2.2.3.2 Autumn 2022 deep soil leaching profiles 19 2.2.4 Groundwater monitoring 19 2.2.4.1 Electromagnetic induction survey 19 2.2.4.2 Groundwater monitoring in relation to effluent irrigation 20 2.2.4.3 Groundwater monitoring in relation to the FECB ammonia plume 22