improvement was required in OWSL’s level of environmental and administrative performance with the
resource consents as defined in Section 1.1.4. The abstraction rate of 50 L/s as set by consent 0231-4 was
breached multiple times. OWSL made adjustments to the rate of take and were compliant by the end of the
monitoring period. There were also multiple breaches of consent 10314-1 whereby OWSL continued to
operate when flows were less than 151 L/s downstream of the weir. This low water flow generally …
consent holders were found to achieve a high level of environmental
performance and compliance for 878 (87%) of a total of 1007 consents monitored through the Taranaki
tailored monitoring programmes, while for another 96 (10%) of the consents a good level of environmental
performance and compliance was achieved. A further 27 (3%) of consents monitored required improvement
in their performance, while the remaining one (<1%) achieved a rating of poor.
This report includes recommendations to be
details of the performance and extent of compliance by CCCWSL, this report
also assigns them a rating for their environmental and administrative performance during the period under
review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with CCCWSL’s approach to
demonstrating consent compliance in site operations and management including the timely
that there may be other chances for Transport Choices funding and Public
Transport opportunities.
• Inflation has had a large impact, with cut backs in place to ensure rate payers are
not having to pay extra. Low cost low risk programmes have been deferred.
• The coastal walkway extension has had all Iwi informed with handover to follow
soon.
• An incident occurred involving a tree falling in Ōakura, resulted in NPDC being
found liable for the damage due to the tree’s position and
necessary, advocating for good transport networks, providing
public transport services, and ensuring residents and visitors enjoy first-class experiences at our premier
garden/heritage properties at Pukeiti, Tūpare and Hollard Gardens.
The financial impacts of this Plan that differ from the adopted 2018/2028 Long-Term Plan relate solely to the
Yarrow Stadium project. This project will be funded with a loan serviced with a targeted rate ranging from
$47.30 to $70.34 a year, with commercial …
open to the sea were rated as moderately vulnerable. When nutrient/sediment loads
were low and estuaries were open to the sea, estuaries had minimal vulnerability. Charac-
teristic symptoms of eutrophication were opportunistic macroalgal blooms and/or elevated
chlorophyll a symptomatic of phytoplankton blooms, with symptoms of sedimentation being
extensive areas of soft fine muddy sediments. The expression of such symptoms was vari-
able because of the flushing regime - being highly flushed
gave a brief background to the
process leading up today, and thanked management staff for their effort and hard
work required over this process.
Resolved
THAT the Taranaki Regional Council:
a) receives and acknowledges, with thanks, the submissions forwarded in response
to the Consultation Document on the 2019/2020 Annual Plan
b) confirms a nil general rates change for 2019/2020
c) reconfirms the vision for Yarrow Stadium as:
The best regional stadium in New Zealand
committed to returning Yarrow Stadium to operational capability as soon as
reasonably possible. We believe the region deserves no less. Our preferred option is to repair the stands and
update some of the facilities at the same time (Option 2). We’d need to borrow up to $55 million, which would
be repaid over 25 years from a targeted rate that would vary according to constituency. Households would pay
$51 to $76 a year, depending on location.
For another $14 million we could also incorporate
.............................................................................................................................. 5
1.7 Application Rate ................................................................................................................................. 5
1.8 Irrigation Equipment .......................................................................................................................... 5
2.0 Low risk soils .......................................................................................................................................... 6
2.1 Soil drainage
are
compelling cases for the Council to slightly alter the
course originally charted in our 2015/2025 Long-Term
Plan.
This Plan includes what we’re proposing in these three
specific areas, and how you can tell us what you think
about them before we make final decisions.
Financially, the development of changes is relatively
minor. With all three proposals included in the
2017/2018 Annual Plan, general rates will go up 1% as
opposed to the 0.5% rise