Your search for 'rates' returned 2162 results.

Appendix F - Leachate & stormwater management plan

........................................................................ 10 4.4.7 Application Rate (Low risk soils) .......................................................................... 11 4.4.8 Application Depth (High risk soils) ....................................................................... 11 4.4.9 Application Rate (High risk soils) ......................................................................... 11 4.4.10 Soil Chemistry ...................................................................................................... 11 4.4.11

Remediation New Zealand Ltd Uruti Composting Facility Annual Report 2021-2022

quality criteria. Irrigation of wastewater during the year led to mass loadings of nitrogen per hectare that were well in excess of those recommended by the Council and the description of N loadings previously provided by RNZ. The rates of application in 2021-2022 raise questions about whether the ability of pasture to take up nitrogen could be surpassed, and the timing and volume of page irrigation events suggest that irrigation is being used as a means to prevent the

Civil Quarries consent monitoring 2019-2020

region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is …

Dairy Discharge Monitoring Programme

and cost recovery 39 11 Training 41 12 Quality assurance and control 42 13 Review and reporting 43 14 References 44 List of photographs Photo 1 Farm dairy and cows 2 Photo 2 Condition based monitoring with portable device 27 Photo 3 Visual inspection to check condition of the irrigator and application rate 28 Photo 4 Collecting samples, recording temperature and entering sample information into the laboratory database remotely 29 Photo 5 Officer completing inspection

Annual report 2012-2013

abstraction rates/volumes, maintenance of minimum residual flows, provision of abstraction records and all other general conditions of their consent(s). The Council entered a total of 41 incidents over the course of the 2012-2013 period in relation to irrigation consents. This included 18 incidents for breaches of authorised abstraction rates and/or volumes over the course of the irrigation season. Fifteen of these received abatement notices for their non-compliance, while the other three had

20 56 Trustpower Ltd Motukawa HEP Scheme Monitoring Programme Annual Report 2020 2021 2877409 v2

List of tables Table 1 Summary of consents held by the Company for the Motukawa HEP scheme 5 Table 2 Gauging results for gaugings undertaken in relation to the Manganui River residual flow 12 Table 3 Details of consents and special conditions in relation to abstraction rates, discharge rates and water levels and the recording 13 Table 4 Summary of summer Manganui River daily water temperatures (°C) prior to the increase in residual flow to 400 L/s (1992-2002) and for the years since,

TRC Annual Report 2017/2018 - financial statements

revenue from operations - - - 45,629,000 41,622,526 Revenue from non-exchange transactions General rates revenue 7,611,858 7,611,858 7,536,493 7,611,858 7,536,493 Targeted rates revenue 1,865,532 1,865,532 1,820,603 1,865,532 1,820,603 Direct charges revenue 4 4,086,953 4,322,057 3,333,892 4,086,953 3,333,892 Government grants 2,272,444 2,007,987 1,955,372 2,272,444 1,955,372 Vested assets - - - - - Total revenue 4 26,276,063 26,011,421 24,566,238 66,372,062

McKechnie Aluminium monitoring 2020-2021

re-evaluate its approach and that of consent holders to resource management and, ultimately, through the refinement of methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by MASL, this report also assigns them a rating for their environmental and administrative

Stratford Power Station consent monitoring 2019-2020

physicochemical analysis and three biomonitoring surveys of receiving waters. In addition, monthly emission results and abstraction records were provided to the Council which were reviewed. The monitoring showed that the Stratford Power Station continued to be well managed with negligible environmental effects as a process of the exercise of their consents. Surface water abstraction was compliant with daily rate and volume. Process water discharges were compliant with consent defined …

Form 520: Certificate of compliance

rates notice) _________________________________________________________________________________ _________________________________________________________________________________ 2.5 Assessment/Valuation number of property (refer to land title or rates notice) _____________________________________________________________________________________________________ 2.6 Name of closest river or stream to the works? page 06/22- #650412 Page 4 of 8