Your search for 'rates' returned 2163 results.

Supplementary Officer Report for Resource Consent

wind direction was from the east to north- east – that is, from the poultry sheds towards the Hibells. Notably, there were no further complaints during this time, even though during this period there were times when shed doors were open, ventilation rates were high, and birds were being removed. page 2987898 Supplementary report AFT farm December 2021- February 2022 43. The Hibells lodged a second complaint with the Council, on 8 February at 5.39 pm. Again the complaint

Council meeting agenda August 2019

b) approves the Taranaki Stadium Trust’s request for major transaction approval in relation to the up to $50m repair and upgrade programme for Yarrow Stadium. MacLeod/Joyce 8. Setting of Rates: 2019/2020 8.1 Mr M J Nield, Director-Corporate Services, spoke to the memorandum, advising Members that having adopted the 2019/2020 Annual Plan on 21 May 2019, the purpose of this memorandum is to set the rates for the 2019/2020 financial year. The rates are driven from the adopted

OMV NZ Ltd Pohukura Production Station Annual Report 2021-2022

achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental performance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these

Ballance Kapuni consent monitoring 2019-2020

Kapuni Stream abstraction 11 page ii 2.1.2.3 Intake options report and monitoring programme 11 2.1.2.4 Annual meeting regarding the Waingongoro River intake and environmental performance 11 2.1.3 Discharge monitoring 12 2.1.3.1 Stormwater and raw water treatment discharges 12 2.1.4 Receiving environment monitoring 16 2.2 Land 17 2.2.1 Inspections 18 2.2.2 Discharge monitoring 19 2.2.2.1 Effluent volume 19 2.2.2.2 Nitrogen application rates

Annual Report 2014/2015 - full document

surplus of $761,000 (total comprehensive income). Expenditure was $777,000 below budget while revenue was $238,000 above budget. This was a good result, noting that general rates had been raised by around 1.5% for each of the previous two years, which is well below inflation levels. The Council’s balance sheet remains very strong with no public debt. We gratefully acknowledge the efforts and achievements of Council staff during the year, ably governed by a team of Councillors providing

Ōaonui Water Supply Ltd monitoring 2018-2019

common terms and abbreviations 16 Bibliography and references 17 Appendix I Resource consents held by Oaonui Water Supplies Limited page ii List of tables Table 1 Resource consents held by the Company 4 Table 2 Summary of compliance with abstraction rates and data supply 7 Table 3 Incidents, investigations, and interventions summary table 10 Table 4 Summary of performance for Consent 0231-4 11 Table 5 Summary of performance for Consent 5453-2 12

Annual Report 2013/2014 - full document

regional plan requirements. The non- compliance rate for failure to meet resource consent conditions was 6.6% for dairy farms, a small change from the previous year. The Council will continue to monitor farm dairy effluent systems closely to ensure compliance with the Council’s requirements. Complementing the agricultural monitoring programme, the Council inspected 221 minor industrial operations in 2013/2014. Minor industries include agricultural services, light engineering, panel beaters,

Annual Report 2015/2016 - full document

remain high for the Mt Messenger and Awakino projects. STRONG FINANCIAL POSITION The Council finished the 2015/2016 year with a surplus of $963,000 (total comprehensive income). Expenditure was $373,000 over budget, in large part due to the Council providing unbudgeted emergency funding to assist those in need following the severe winter storm damage. Overall it was a good result, noting that general rates increases have been at or below the rate of inflation

Todd Generation Junction Road Power Station Monitoring Programme Annual Report 2020 2021

rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and management including the timely provision of information to Council (such as contingency plans and water take data) in accordance

Annual report 2015-2016

production bore, abstraction pipework monitoring equipment and associated infrastructure; and  obtaining manual measurements of groundwater levels in the production and observation bores and retrieving electronic data. To monitor the exercising of consent 7470-1.1 abstraction volume and rate data are recorded electronically at the site by a data logging system and transferred to the Council via telemetry, so the data can be viewed in real time. Three groundwater monitoring bores were also