Your search for 'rates' returned 2299 results.

SOE2022 Surface Water Quantity

climate and water use. This enables us to assess the likely impacts of current and future water takes on our waterways and the environmental, social and cultural values they support. To protect these values, we set limits on how much water can be taken from rivers, streams and lakes, and the rate at which it can be abstracted. We manage the use of water through policies, regional rules and resource consents issued to water users. River flows For water management purposes

Westown Haulage Cowling Road Annual Report 2021-2022

compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these ratings are found in Appendix II For reference, in the 2021-2022 year, consent holders were found to achieve a high level of environmental performance and compliance for 88% of

Todd Kapuni Gas Treatment Plant (KGTP) Annual Report 2021-22

considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental performance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental

Report 2013-2014

located on Coronation Avenue, New Plymouth. The site is located within the Te Henui catchment, and forms part of the eastern boundary of Pukekura Park. TTR was granted resource consent 7470-1 in August 2009 by the Taranki Regional Council (the Council). The consent authorised the abstraction of up to 170 cubic metres per day (m3/day) of groundwater from an on-site production bore, at a rate not exceeding 10 litres per second. This consent was amended to 7470-1.1 on 10 June 2014, where the

Rules 1-29: Industrial-trade discharges (excluding waste management)

except for direct heating, whether on industrial or trade premises or on production land 1 Small-scale combustion of natural gas or liquefied petroleum gas a) The maximum rate of heat release from within the combustion process does not exceed 1 MW per combustion chamber b) Discharge is free of visible smoke Permitted Discharges of contaminants to air from equipment burning natural gas or liquefied petroleum gas as a fuel for any purpose, excluding direct

Todd Petroleum Ltd Mangahewa D Hydraulic Fracturing Report 2019-2021

utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative

TRC Annual Report 2020/2021 summary

lifestyles Regional Council Taranaki Taking Taranaki Regional Council Taranaki Yarrow Stadium reduction in targeted Yarrow Stadium rate following $20m COVID recovery infrastructure investment by the Govt. Public bus services and transport 26,775 55,220 Citylink passenger trips up 7.6% subsidised trips up by 1924 Total Mobility cardholders passenger trips on the Connector -New Plymouth service up 6.8%Hāwera 548,870 Connecting with the community engagements

Report 2009-2013

Raceway, located on Coronation Avenue, New Plymouth. The site is located within the Te Henui catchment, and forms part of the eastern boundary of Pukekura Park. The Taranaki Racing Club was granted resource consent 7470-1 in August 2009. The consent authorises the abstraction of up to 170 cubic metres per day of groundwater from an on-site production bore, at a rate not exceeding 10 litres per second. Groundwater abstracted under consent 7470-1 is primarily used for irrigation purposes. The

Osflo Fertiliser Ltd Monitoring Programme Annual Report 2021-2022

responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both

Motukawa HEPS Existing Environment Legal Advice Obtained by TRC

expired consents (including the consents for the dam structures themselves), while also seeking to increase the rate of take / diversion from the Manganui River from 5.2m3/s to 7.5m3/s. 3. You have asked for our advice on what constitutes the “existing environment” when considering the application to replace the expired consents. In particular, you have asked: a. Where structures impede desired fish passage, but have been in place for over 90 years, can the Council require (and