Taranaki Regional Council to assess the environmental performance
during the period under review, and the results and effects of the consent holder’s activities.
The Council’s monitoring programme included three regular inspections, one additional
inspection, and two biological receiving water surveys. Two short duration overflows (four
to five days) occurred between late September and mid October 2013.
Regular inspections indicated no problems with the ponds’ system maintenance or
operation,
DWI activities during this period.
The report also outlines the compliance monitoring programme implemented by the
Taranaki Regional Council (the Council) with regard to these activities, discusses its
results, and provides an assessment of the Company’s performance with regard to
consent compliance. The report concludes with recommendations regarding the future
monitoring of the Company’s DWI activities.
1.1.2 Structure of this report
Section 1 of this report is a background
page
CO AS TAL P L AN F O R TARANAK I
Section 32 Evaluation Report
Proposed Coastal Plan for Taranaki
Taranaki Regional Council
Private Bag 713
Stratford 4352
February 2018
Document number: 1984943
page
CO AS TAL P L AN F O R TARANAK I
THIS PAGE IS INTENTIONALLY BLANK
page
i
CO AS TAL P L AN F O R TARANAK I
Table of contents
Arei Road, in the
Waiongana catchment. The Company holds one consent to allow it to discharge treated
stormwater and washwater onto land and into the Waiongana River. This report for the
period July 2011-June 2013 describes the monitoring programme implemented by the
Taranaki Regional Council (The Council) to assess the environmental performance of the
Company during the period under review, and the results and environmental effects of the
Company’s activities.
The Company holds one
catchment, having taken over management from the former consent holders Inglewood Metals Ltd during
the monitoring period covered by this report.
This report for the period July 2016 to June 2017 describes the monitoring programme implemented by the
Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance
performance during the period under review. The report also details the results of the monitoring
undertaken and assesses the environmental effects
petrochemical production station
located on Upper Durham Road at Inglewood, in the Waitara catchment. The Sidewinder
Production Station processes oil and gas from the Company’s adjacent Sidewinder wellsite.
This report for the period July 2015 to June 2016 describes the monitoring programme
implemented by the Taranaki Regional Council (the Council) to assess the Company’s
environmental performance during the period under review. The report also details the results
of the monitoring undertaken and
subsidiaries of NZEC (the Company) operate a
number of wellsites within the Taranaki Region, most notably the Waihapa-D, Waihapa-F and Waitapu
wellsites. The Waihapa-F wellsite is located on Bird Road, Stratford. The Waihapa-D and Waitapu wellsites
are located on Cheal Road, Stratford. This report for the period July 2016 to June 2017 describes the
monitoring programme implemented by the Taranaki Regional Council (the Council) in relation to the
Company’s deep well injection (DWI) activities. The
also re-worked during the period under review.
During the monitoring period, Tag Oil demonstrated a high level of environmental
performance at the Cheal-B wellsite.
This report for TAG Oil (NZ) Limited describes the monitoring programme implemented by
the Taranaki Regional Council (the Council) to assess TAG Oil (NZ) Limited’s
environmental performance in relation to drilling operations at the Cheal-B wellsite during
the period under review, and the results and environmental effects of
catchment. The sole source of the wood waste is from the Company’s sawmilling
operation in Inglewood. The Company sells most of its woodchip and sawdust as calf litter. The remaining
material consisting of bark, soil and soiled woodchip/sawdust is sent to the Bristol Road site for disposal.
This report for the period July 2017 to June 2018 describes the monitoring programme implemented by the
Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance
Taranaki Regional Council (the
Council) describing the monitoring programme associated with 16 industries within the catchment of the
Mangati Stream, Bell Block.
The Mangati catchment has, in the past, been heavily utilised for the disposal of stormwater and
wastewaters from a large number of industrial sites. As a consequence of inadequate treatment and
management of discharges and minimal dilution capacity in the past, the water quality and aquatic
ecosystems of the stream were