Your search for 'iwi map' returned 2140 results.

Annual report 2014-2015

to minimise adverse environmental effects. Condition 7 requires all works shall comply with noise standards. Condition 8 requires the consent holder to survey and map the position of the structures. Condition 9 requires the consent holder undertake pre and post-lay surveys of the pipeline corridor. Condition 10 states that the structure shall be removed and the area reinstated, if and when it is no longer required. Conditions 11 and 12 are lapse and review provisions.

SDC Closed Landfills Monitoring Programme Annual Report 2021-2022

List of figures Figure 1 Regional map showing SDC landfill sites 3 Figure 2 Stratford landfill (shaded in yellow) and sampling locations 5 Figure 3 Graph showing chloride levels in the groundwater at the Stratford landfill 8 Figure 4 Graph showing ammoniacal nitrogen levels in the groundwater at the Stratford landfill 8 Figure 5 Graph showing dissolved zinc levels in the groundwater at the Stratford landfill 9 Figure 6 Graph showing unionised ammonia levels in the down gradient

Dimar Partnership monitoring report 2017-2018

performance over time 10 List of figures Figure 1 Aerial map of the site showing the location of the refuse dump and sampling sites 4 List of photos Photo 1 Photograph showing the refuse dump prior to capping 5 Photo 2 Photograph showing the refuse dump after capping (foreground) 5 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2017 to June

Annual report 2016-2017

environmental performance over time 11 List of figures Figure 1 Aerial map of the site showing the location of the refuse dump and sampling sites 4 List of photos Photo 1 Photograph showing the refuse dump prior to capping 5 Photo 2 Photograph showing the refuse dump after capping (foreground) 5 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July

Annual report 2016-2017

page ii List of tables Table 1 Summary of performance for consent 1281-3 9 Table 2 Evaluation of environmental performance over time 10 List of figures Figure 1 Aerial location map of Hickman JD 1997 Family Trust 4 Figure 2 Location of the Hickman JD 1997 Family Trust site and associated sampling sites 7 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction

Annual report 2015-2016

List of tables Table 1 Summary of performance for consent 1281-3 10 List of figures Figure 1 Aerial location map of Hickman JD 1997 Family Trust 4 Figure 2 Location of the Hickman JD 1997 Family Trust site and associated sampling sites 8 page 1 1. Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2015 to June 2016 by the Taranaki

Annual report 2012-2013

discharge 17 page ii List of tables Table 1 Summary of performance for Consent 6088-3 to discharge green waste onto land for stabilisation purposes 10 List of figures Figure 1 Regional map showing location of the Patea green waste site 3 Figure 2 Aerial view of the Patea Beach green waste disposal area 4 page 1 1. Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act

Annual report 2014-2015

figures Figure 1 Aerial map of the site showing the location of the refuse dump and sampling sites 4 List of photos Photo 1 Photograph showing the refuse dump prior to capping 5 Photo 2 Photograph showing the refuse dump after capping (foreground) 5 page 1 1. Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is the Annual Report for the period July 2014 to June 2015

Annual report 2013-2014

List of tables Table 1 Results of chemical monitoring of the Mangimangi Stream at Ararata Road for Dimar Partnership compliance monitoring programme 2013- 2014, 26 February 2014 8 Table 2 Results of chemical monitoring of the Mangimangi Stream at Ararata Road for Dimar Partnership compliance monitoring programme 2013- 2014, 26 June 2014 9 Table 3 Summary of performance for Consent 9640-1 11 List of figures Figure 1 Aerial map of site and location of refuse dump

Annual report 2014-2015

programmes for 2015-2016 11 4. Recommendation 12 Glossary of common terms and abbreviations 13 Bibliography and references 15 Appendix I Resource consent held by Hickman JD 1997 Family Trust 1 page List of tables Table 1 Summary of performance for consent 1281-3 10 List of figures Figure 1 Aerial location map of Hickman JD 1997 Family Trust 4 Figure 2 Location of the Hickman JD 1997 Family Trust site and associated sampling