Your search for 'rain fall' returned 1800 results.

Appendix 5: Intensive poultry farming managment

contours (3) orientation to the sun. g) Discharge point design Dispersion of discharges is enhanced by: increasing the height of discharge points; avoiding the use of conical rain shields over the top of discharge stacks; increasing vertical exhaust velocities by appropriate fan speeds, fan sizes, and shaft sizes; the use of vertical discharge fan units with minimal obstruction to the outside shaft’s airflow; tunnel

PDP Sept 2002 Dioxin concentrations in residential soil Paritutu New Plymouth

million tonnes of soil. On residential properties nearest to the Dow plant, soil dioxin concentrations were typically in the range 5 to 15 ng/kg of soil, falling to a range of 1 to 5 ng/kg further out. One sample had a concentration of 27 ng/kg. There was 92 ng/kg measured at a non-residential site, on the west- facing slope of Mount Moturoa Domain. Generally there was little difference between soil dioxin levels in lawn areas compared with gardens on the same property.

April 2021 hydrology report

page Doc. No: 2765952 TARANAKI REGIONAL COUNCIL MONTHLY RAINFALL AND RIVER REPORT FOR April 2021 Provisional Data Only Note: some sites record a number of parameters Table 1: Rainfall at 27 sites throughout the region Station Sub-region Monthly Year to Date Records Began Number of rain days (>0.5mm) Total Monthly Rainfall (mm) % of Monthly Normal (%) Total to date (mm) % of Normal for year to date % of average full calendar year Nth

Consents and Regulatory Committee Agenda August 2022

the NPS- FM objective. Given that the Council can only consider policies that relate to the matters over which the Council has reserved control through the plan itself, the Council is unable to take into account matters that fall outside this scope. You will be aware that, with few exceptions, when a dairy consent involving a discharge to water is replaced, the Council only allows the water discharge to continue until 1 December 2022, then the only discharge allowed is to land.

Annual report 2013-2014

inspections focussed on the presence or absence of unacceptable materials, the stability of the green waste stacks (against wind), and the management of any stormwater and leachate. page 7 2. Results 2.1 Inspections 23 October 2013 A site visit was made to conduct a compliance monitoring inspection. The weather was showery with seven mm of rain falling over the previous 24 hours. There did not appear to have been much activity at the site since the last inspection.

Consents and Regulatory Committee Agenda March 2022

104A of the Resource Management Act). Rules 35 and 36 of the RFWP do not include any matters of control that expressly allow for the consideration of matters such as those expressed in the NPS-FM objective. Given that the Council can only consider policies that relate to the matters over which the Council has reserved control through the plan itself, the Council is unable to take into account matters that fall outside this scope. R2/10979-1.0 Commencement Date: