page
Doc. No: 3033222
TARANAKI REGIONAL COUNCIL MONTHLY RAINFALL AND RIVER REPORT FOR March 2022
Provisional Data Only
Note: some sites record a number of parameters
Table 1: Rainfall at 27 sites throughout the region
Station Sub-region
Monthly Year to Date
Records Began Number of rain
days (>0.5mm)
Total Monthly
Rainfall (mm)
% of Monthly
Normal (%)
Total to date
(mm)
% of Normal for
year to date
% of average full
calendar year
Nth
million tonnes of soil.
On residential properties nearest to the Dow plant, soil dioxin concentrations were typically in the
range 5 to 15 ng/kg of soil, falling to a range of 1 to 5 ng/kg further out. One sample had a
concentration of 27 ng/kg. There was 92 ng/kg measured at a non-residential site, on the west-
facing slope of Mount Moturoa Domain.
Generally there was little difference between soil dioxin levels in lawn areas compared with
gardens on the same property.
Civil Quarries Ltd Everett Road Quarry
page
Doc. No: 2765952
TARANAKI REGIONAL COUNCIL MONTHLY RAINFALL AND RIVER REPORT FOR April 2021
Provisional Data Only
Note: some sites record a number of parameters
Table 1: Rainfall at 27 sites throughout the region
Station Sub-region
Monthly Year to Date
Records Began Number of rain
days (>0.5mm)
Total Monthly
Rainfall (mm)
% of Monthly
Normal (%)
Total to date
(mm)
% of Normal for
year to date
% of average full
calendar year
Nth
inspections
focussed on the presence or absence of unacceptable materials, the stability of the green
waste stacks (against wind), and the management of any stormwater and leachate.
page
7
2. Results
2.1 Inspections
23 October 2013
A site visit was made to conduct a compliance monitoring inspection. The weather was
showery with seven mm of rain falling over the previous 24 hours.
There did not appear to have been much activity at the site since the last inspection.
the NPS-
FM objective. Given that the Council can only consider policies that relate to the matters over which the
Council has reserved control through the plan itself, the Council is unable to take into account matters that
fall outside this scope.
You will be aware that, with few exceptions, when a dairy consent involving a discharge to water is replaced,
the Council only allows the water discharge to continue until 1 December 2022, then the only discharge
allowed is to land.
104A of the Resource Management Act). Rules 35
and 36 of the RFWP do not include any matters of control that expressly allow for the consideration of
matters such as those expressed in the NPS-FM objective. Given that the Council can only consider policies
that relate to the matters over which the Council has reserved control through the plan itself, the Council is
unable to take into account matters that fall outside this scope.
R2/10979-1.0 Commencement Date: