Your search for '72' returned 878 results.

Summer 2015-2016

Coastal bathing beach monitoring report - Taranaki Regional Council.

Report 2012-2013

g/m3 29 page 14 Analyte Units Mangahewa-05 (18/07/2012) Benzene g/m3 0.0061 Toluene g/m3 0.036 Ethylbenzene g/m3 0.0038 m&p-Xylene g/m3 0.011 o-Xylene g/m3 0.0079 C7 - C9 g/m3 0.8 C10 - C14 g/m3 33 C15 - C36 g/m3 72 Total hydrocarbons (C7 - C36) g/m3 106 The results of the analyses carried out on the return fluid sample obtained following the hydraulic fracturing of the Mangahewa-05 well are summarised below in Table 7.

Fonterra Kapuni consent monitoring 2020-2021

Kaupokonui Stream from the monthly stream surveys, with previous years for comparison 70 Figure 50 Groundwater monitoring bores, Motumate and Waiokura Stream sampling site locations on the three Company farms 72 Figure 51 Three year trends in groundwater conductivity at Farm 1 75 Figure 52 Three year trends in groundwater potassium at Farm 1 75 Figure 53 Three year trends in groundwater alkalinity at Farm 1 76 Figure 54 Long term trends in groundwater sodium concentration at Farm 1

Annual report 2014-2015

NPDC landfills consent monitoring report - Taranaki Regional Council.

Annual report 2012-2013

previous 72 hours. The compost area was tidy and organised and no noticeable odours were detected on the compost pad. All of the ponds were empty except for the top pond which had about 30 cm of water in it. Refuse was being tipped and spread at the time of the inspection and the tip face appeared to be within the 900 m2 limit. It was noted that the access tracks from the road to the tipface had been heavily watered and this was suppressing dust effectively. Seven sites were surveyed for

Statement of Proposal 2023-24 Section 36 Schedule of Administrative Charges

FRESHWATER: CULVERTS AND WEIRS With reference to regulation 75 of the NES-FW, the Council sets the following charges, under section 36(1)(cc) of the Resource Management Act 1991, for monitoring permitted activities authorised under regulations in the NES- FW installed after 3 September 2020. The Council may charge for monitoring permitted activities for compliance inspections and monitoring under the following sections of the regulations:  70 Culverts  72 Weirs. Inspection