Your search for 'rates' returned 2189 results.

NPDC Inglewood WWTP Annual Report 2020-2021

refinement of methods and considered responsible resource utilisation, to move closer to achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by NPDC, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely

New Zealand Energy Corporation DWI Annual Report 2021-2022

1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these ratings are found in Appendix II. For

Form 111: Discharge stormwater to water or land (including Coastal Marine Area)

_________________________________________________________________________________ 3.4 Map Co-ordinates at point of discharge (either Longitude/Latitude or NZTM): ________________________ Longitude ________________________ Latitude OR ________________________ E ________________________ N (NZTM) 3.5 Legal description of property at site of activity (refer to land title or rates notice) _________________________________________________________________________________

Annual report 2012-2013

abstraction rates/volumes, maintenance of minimum residual flows, provision of abstraction records and all other general conditions of their consent(s). The Council entered a total of 41 incidents over the course of the 2012-2013 period in relation to irrigation consents. This included 18 incidents for breaches of authorised abstraction rates and/or volumes over the course of the irrigation season. Fifteen of these received abatement notices for their non-compliance, while the other three had

Civil Quarries consent monitoring 2019-2020

region’s resources. 1.1.4 Evaluation of environmental and administrative performance Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is …

TRC Annual Report 2017/2018 - financial statements

revenue from operations - - - 45,629,000 41,622,526 Revenue from non-exchange transactions General rates revenue 7,611,858 7,611,858 7,536,493 7,611,858 7,536,493 Targeted rates revenue 1,865,532 1,865,532 1,820,603 1,865,532 1,820,603 Direct charges revenue 4 4,086,953 4,322,057 3,333,892 4,086,953 3,333,892 Government grants 2,272,444 2,007,987 1,955,372 2,272,444 1,955,372 Vested assets - - - - - Total revenue 4 26,276,063 26,011,421 24,566,238 66,372,062

Dairy Discharge Monitoring Programme

and cost recovery 39 11 Training 41 12 Quality assurance and control 42 13 Review and reporting 43 14 References 44 List of photographs Photo 1 Farm dairy and cows 2 Photo 2 Condition based monitoring with portable device 27 Photo 3 Visual inspection to check condition of the irrigator and application rate 28 Photo 4 Collecting samples, recording temperature and entering sample information into the laboratory database remotely 29 Photo 5 Officer completing inspection

Trustpower Ltd Motukawa HEP Scheme Annual Report 2020 2021

List of tables Table 1 Summary of consents held by the Company for the Motukawa HEP scheme 5 Table 2 Gauging results for gaugings undertaken in relation to the Manganui River residual flow 12 Table 3 Details of consents and special conditions in relation to abstraction rates, discharge rates and water levels and the recording 13 Table 4 Summary of summer Manganui River daily water temperatures (°C) prior to the increase in residual flow to 400 L/s (1992-2002) and for the years since,

Weld Road Reserve Landscape Visual Effects Assessment

landscape and visual effects of the proposal in the context of the site and the wider landscape setting, as well as effects on key public views. This assessment has been prepared with reference to the NZILA Best Practice Note Landscape Assessment and Sustainable Management 10.1 in conjunction with Information requirements for the assessment of landscape and visual effects”2. The effects ratings and definitions used in Table 1 are provided in Appendix B. To determine the overall nature and

Ample Group monitoring report 2019-2020

assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and management including the timely provision of information to Council (such as contingency plans and water take data) …