Environmental
and structures (natural and man-made) that fish are able to negotiate over (both up and downstream).
The diversion of water for abstraction poses another impediment to fish migration if there is no safe
passage back to the river.
Water diverted for hydro generation is potentially damaging for fish and lethal in some cases. Fish
passing through turbines are subjected to pressure changes, cavitation and shear damage, and
mechanical strike. The survival rate during turbine passage is
viable.
To assess where irrigation may be viable modelling of irrigation demand was carried
out. Only land with a slope less than 15 degrees and that is currently classified as
‘productive farmland’ was considered. Weather and soil water holding data was then
analysed and parameters around irrigation application rates and reliability of supply
were applied.
For the cost benefits of irrigation to be determined the pasture yield response to
irrigation was assessed using the AusFarm
RFWP Rule 43
caption _Ref53651562 Table 1 : Resource Consents applied for and relevant regional plan rule
_Toc98245831 Consent 1795-5.0: Take water from the Waiaua River
numbered_Paras This is straightforward intake of water from behind the weir and is described in section 2 above. The expired consent specified a maximum take of 3900 L/s but there is no metering of the take rate so compliance with this condition has never been monitored. We assume that his limit is based on the
details of the performance and extent of compliance by the Company, this
report also assigns them a rating for their environmental and administrative performance during the period
under review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with the Company’s
approach to demonstrating consent compliance in site operations and management including the
assigns them a rating for their environmental and administrative performance during the period
under review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with the Company’s
approach to demonstrating consent compliance in site operations and management including the timely
provision of information to Council (such as contingency plans and water take data)
compliance by the consent holder/s
during the period under review, this report also assigns a rating as to each Company’s environmental and
administrative performance.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative compliance is concerned with the Company’s approach
to demonstrating consent compliance in site operations and management including the timely provision of
information to …
region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by the consent holders,
this report also assigns a rating as to each Company’s environmental and administrative performance during
the period under review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative
Co-ordinates at point of discharge (either Longitude/Latitude or NZTM):
Longitude _ Latitude OR
/7J /7^ _ E ^-^57.9^ N (NZTM)
3. 5 Legal description of property at site of activity (refer to land title or rates notice)
ft^f Se&ho^ ^ /3/oil^ // Ufffjer 44//ff. r^
~n
3.6 Assessment/Valuation number of property (refer to land title or rates notice)
r^^i//^^1
07/17-i»623858
Page 3 of 16
page
3. 7 If the discharge is to water, name the river or stream that the discharge goes to or
With all three proposals included in
the 2017/2018 Annual Plan, general rates will go up 1% as opposed to the 0.5% rise forecast for
2017/2018 in the 2015/2025 Long-Term Plan.
This Consultation Document sets out the details and implications of what we’re proposing in these
three specific areas, and how you can tell us what you think about them before we make final
decisions.
You can make a submission by letter, by email, or via our website, www.trc.govt.nz. If you
the
region’s resources.
1.1.4. Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by SDC, this report also
assigns them a rating for their environmental and administrative performance during the period under
review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is