Proposed Taranaki Coastal Plan – Oil and Gas
IN THE ENVIRONMENT COURT
AT AUCKLAND
I TE KŌTI TAIAO O AOTEAROA
KI TĀMAKI MAKAURAU
Decision [2022] NZEnvC 232
IN THE MATTER OF an appeal under clause 14 of Schedule 1
of the Resource Management Act 1991
BETWEEN ENERGY RESOURCES AOTEAROA
INCORPORATED
(ENV-2019-AKL-297)
TARANAKI ENERGY WATCH
INCORPORATED
(ENV-2019-AKL-299)
Appellants
AND TARANAKI REGIONAL COUNCIL
Respondent
Court: Judge
consent) under any relevant regional plan(s)
Assessment of the activity against any relevant National Policy Statement(s) and National
Environmental Standards
Provided an assessment of your proposed activity against the matters sent out in Part 2 of the RMA
Site plan, engineering plans and calculations
Consent duration sought
Provided a site sediment and erosion control plan if required
Applied for any district council consents that are also required for your
One and Mountain View) and Area-B (Block
Two) 27
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is for the period July 2021 to June 2022 by the Taranaki Regional Council (the Council)
describing the results of the monitoring programme associated with the resource consent held by New
Plymouth District Council (NPDC) for discharges related the Mangapouri Cemetery (the
applicant's agreement.
Do you agree to the Taranaki Regional Council extending RMA
consent processing timeframes?
NA
page
Surrender of existing consent
Please note that your existing consent is to be surrendered on the granting of this application.
Documents
Mangorei HEPS AEE Cover Letter - Trustpower - 25 November 2020.pdf
Mangorei HEPS AEE - Trustpower - 25 November 2020.pdf
A. Land Ownership Maps - Tonkin & Taylor.pdf
B. Records of Title.pdf
page
Executive summary
Greymouth Petroleum Ltd and its subsidiaries (the Company) operate a number of wellsites across the
Taranaki region, with major fields located in the Tikorangi and Kaimiro areas. Each wellsite contains varying
numbers of producing wells and associated production infrastructure. This report for the period July 2021 to
June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the
Council) in relation to the Company’s deep
conditions:
General Conditions
1. On receipt of a requirement from the Chief Executive, Taranaki Regional Council (hereinafter
the Chief Executive), the consent holder shall, within the time specified in the requirement,
supply the information required relating to the exercise of this consent.
2. Unless it is otherwise specified in the conditions of this consent, compliance with any
monitoring requirement imposed by this consent must be at the consent holder’s own
non-notified
application), however these timeframes can be extended with the applicant's agreement.
Do you agree to the Taranaki Regional Council extending RMA
consent processing timeframes?
NA
Documents
Mangorei HEPS AEE Cover Letter - Trustpower - 25 November 2020.pdf
Mangorei HEPS AEE - Trustpower - 25 November 2020.pdf
A. Land Ownership Maps - Tonkin & Taylor.pdf
B. Records of Title.pdf
C. Existing Resource Consent Conditions - Taranaki Regional Council.pdf
(the focus of which is to promote sustainable management of natural
resources) and supported by the relevant Regional Plan, if adverse environmental effects are avoided, remedied or mitigated.
Part 2 and policy assessment I adopt the RMA assessment above
Consultation and Affected Parties
Council may determine that your application is to be notified. But generally it will be non-notified if there are no more than
minor adverse effects beyond the adjacent land, and if written
Connector is operated by Pickering Motors Ltd
with support from Taranaki Regional Council
INGLEWOOD
ELTHAM
STRATFORD
ŌPUNAKE
HĀWERA
NEW PLYMOUTH
PĀTEA
Fare Zones
Please scan code for
up-to-date discounts
and concessions
Page 1
Page 2
page
25 November 2020
Taranaki Regional Council
Private Bag 713
Stratford 4352
Taranaki
By Email consents@trc.govt.nz
APPLICATION FOR RESOURCE CONSENTS – TRUSTPOWER LIMITED’S MANGOREI HYDRO-
ELECTRIC POWER SCHEME
Lodgement of Application
The Mangorei Hydro-Electric Power Scheme (“Scheme”) is owned and operated by Trustpower
Limited (“Trustpower”) and is located within the Waiwhakaiho River catchment,