Your search for 'vision mission goals of Taranki Region Council' returned 4845 results.

McKechnie Aluminium Annual Report 2021-2022

Executive summary McKechnie Aluminium Solutions Ltd (MASL) operates an aluminium foundry and extrusion plant located at Bell Block, in the Mangaone and Mangati catchments. Processing of copper and brass (copper/zinc) at the plant ceased in June 2002 and January 2003, respectively. This report for the period July 2021 to June 2022 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess MASL’s environmental and consent compliance performance during the

TRC Annual Report Summary 2022 2023

Ad Size: M8X8, (25.4X36.6 cms width by height) STFD PRESS XX Oct 2023 P/O# xxxx 4x Full pages sent separately 370mm tall x 254mm wide with no bleed est. $700 +gst per page ? Stratford Press Run Of Paper Annual Report page 4Full Pg OPUNAKE COASTAL XX Oct 2023 page size: 260x370mm centrespread: 550x370mm P/O# xxx HWA STAR - Lift ad from Midweek XX Oct 2023 P/O# xxxx 4x Full pages incl Centrespread Customer:TAR REGIONAL COUNCIL Caption:

STDC Kaponga, Manaia, Patea and Waverley WWTPs Monitoring Programme 2021-2022

the Taranaki Regional Council (the Council) to assess STDC’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of STDC’s activities. During the monitoring period, STDC demonstrated an overall high level of environmental performance and a high level of administrative performance. STDC holds seven resource consents for the Waverley, Kaponga, Manaia and

Mangati Catchment Joint Monitoring Programme Annual Report 2021-2022

report is the Annual Report for the period July 2021 to June 2022 by the Taranaki Regional Council (the Council) describing the monitoring programme associated with 13 industries within the catchment of the Mangati Stream, Bell Block. Overall, a high level of environmental performance was achieved by the consent holders in the industrial area of the Mangati Stream catchment. The Mangati catchment has, in the past, been heavily utilised for the disposal of stormwater and wastewaters from

Westown Haulage Cowling Road Annual Report 2021-2022

programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during this period. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities. During the monitoring period, the Company demonstrated an overall high level of environmental performance and required improvement regarding their administrative performance. The Company holds one

Todd Generation Junction Road Power Station Annual Report 2020-2021

July 2020 to June 2021 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities. The Company holds five resource consents, which include a total of 67 conditions setting out the requirements that the Company must satisfy.

Fonterra Kapuni Monitoring Programme Annual Report 2020 2021

land on two nearby farms. This report for the period July 2020 to June 2021 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities. During the monitoring period, the Company demonstrated an overall high level of environmental performance.

Intensive Winter Grazing Factsheet FAQs and useful links

the slope, the wider the buffer should be. Examples of vegetated buffers. Where do I measure the buffer distance from? The 5m buffer must be measured from the edge of the bed for rivers and lakes. This is measured from where the river reaches its fullest flow without overtopping its banks. Speak to your Regional Council for help on measuring buffers from wetlands. The aim is to avoid winter grazing in wet areas. If in doubt, be conservative and put in

Greymouth Petroleum Mining Group Ltd Turangi A Well Hydraulic Fracturing Report 2018-2021

the monitoring programme implemented by the Taranaki Regional Council (the Council) in relation to the programme of hydraulic fracturing undertaken by Greymouth Petroleum Turangi Limited (the Company) at the Turangi-A wellsite, over the period 15 October 2019 to 8 January 2020. The report also assesses the Company’s level of environmental performance and compliance with the resource consent held in relation to the activity. The programme of hydraulic fracturing undertaken by the Company

Tawhiti Catchment Annual Report 2021-2022

page page Tawhiti Catchment Monitoring Programme Annual Report 2021-2022 Technical Report 2022-19 Taranaki Regional Council Private Bag 713 Stratford ISSN: 1178-1467 (Online) Document: 3038265 (Word) Document: 3102654 (Pdf) November 2022 page page Executive summary The Tawhiti Stream catchment, east of Hawera, is the location of several industries