Executive summary
McKechnie Aluminium Solutions Ltd (MASL) operates an aluminium foundry and extrusion plant located at
Bell Block, in the Mangaone and Mangati catchments. Processing of copper and brass (copper/zinc) at the
plant ceased in June 2002 and January 2003, respectively. This report for the period July 2021 to June 2022
describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess
MASL’s environmental and consent compliance performance during the
Ad Size: M8X8, (25.4X36.6 cms width by height)
STFD PRESS
XX Oct 2023
P/O# xxxx
4x Full pages sent separately
370mm tall x 254mm wide with no bleed
est. $700 +gst per page ?
Stratford Press
Run Of Paper
Annual Report page 4Full Pg
OPUNAKE COASTAL
XX Oct 2023
page size: 260x370mm
centrespread: 550x370mm
P/O# xxx
HWA STAR - Lift ad from Midweek
XX Oct 2023
P/O# xxxx
4x Full pages incl Centrespread
Customer:TAR REGIONAL COUNCIL
Caption:
the Taranaki Regional Council (the Council) to assess
STDC’s environmental and consent compliance performance during the period under review. The report also
details the results of the monitoring undertaken and assesses the environmental effects of STDC’s activities.
During the monitoring period, STDC demonstrated an overall high level of environmental performance
and a high level of administrative performance.
STDC holds seven resource consents for the Waverley, Kaponga, Manaia and
report is the Annual Report for the period July 2021 to June 2022 by the Taranaki Regional Council (the
Council) describing the monitoring programme associated with 13 industries within the catchment of the
Mangati Stream, Bell Block.
Overall, a high level of environmental performance was achieved by the consent holders in the industrial
area of the Mangati Stream catchment.
The Mangati catchment has, in the past, been heavily utilised for the disposal of stormwater and
wastewaters from
programme implemented
by the Taranaki Regional Council (the Council) to assess the Company’s environmental and consent
compliance performance during this period. The report also details the results of the monitoring undertaken
and assesses the environmental effects of the Company’s activities.
During the monitoring period, the Company demonstrated an overall high level of environmental
performance and required improvement regarding their administrative performance.
The Company holds one
July 2020 to June 2021 describes the monitoring programme implemented by the
Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance
performance during the period under review. The report also details the results of the monitoring
undertaken and assesses the environmental effects of the Company’s activities.
The Company holds five resource consents, which include a total of 67 conditions setting out the
requirements that the Company must satisfy.
land on two nearby farms. This report for the period July 2020 to June 2021
describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess
the Company’s environmental performance during the period under review. The report also details the
results of the monitoring undertaken and assesses the environmental effects of the Company’s activities.
During the monitoring period, the Company demonstrated an overall high level of environmental
performance.
the slope, the wider the buffer should be.
Examples of vegetated buffers.
Where do I measure the buffer distance from?
The 5m buffer must be measured from the edge of the bed for rivers and lakes.
This is measured from where the river reaches its fullest flow without overtopping
its banks. Speak to your Regional Council for help on measuring buffers from
wetlands. The aim is to avoid winter grazing in wet areas. If in doubt, be
conservative and put in
the monitoring programme implemented by the Taranaki
Regional Council (the Council) in relation to the programme of hydraulic fracturing undertaken by
Greymouth Petroleum Turangi Limited (the Company) at the Turangi-A wellsite, over the period 15 October
2019 to
8 January 2020. The report also assesses the Company’s level of environmental performance and
compliance with the resource consent held in relation to the activity.
The programme of hydraulic fracturing undertaken by the Company
page
page
Tawhiti Catchment
Monitoring Programme
Annual Report
2021-2022
Technical Report 2022-19
Taranaki Regional Council
Private Bag 713
Stratford
ISSN: 1178-1467 (Online)
Document: 3038265 (Word)
Document: 3102654 (Pdf)
November 2022
page
page
Executive summary
The Tawhiti Stream catchment, east of Hawera, is the location of several industries