Your search for 'rain fall' returned 1855 results.

Application attachment appendix F Aquatic Ecology Assessment Manawa Energy 14 Feb 2023

also shown, together with a comparison of median values with relevant National Objectives Framework (NOF) bands (NPS-FM 2020). Ten-year trend analysis indicates that total and dissolved reactive phosphorus concentrations, and total and ammoniacal nitrogen concentrations are all increasing (i.e., water quality is degrading) at the SH3 site (Table 3.1). This may be related to the intensification of dairying in the catchment. Ammoniacal nitrogen concentrations however fall

Biennial report 2011-2013

C Boyd drilling waste disposal consent monitoring report - Taranaki Regional Council.

Greymouth Petroleum northern sites consent monitoring 2017-2018

was to be scraped in places and new metal laid. The ring drains were dry. The grasses in the ring drain were covered in fine silt. The flare pit was damp and staff advised that works were scheduled to remove sediment from the base of pit so rain water could freely drain to the ring drain. Drip trays and bunds were in use and all drums were bunded. A spill kit was observed to be in place. The site was dry and a few stains were noted around the site. A sample from the second skimmer pit was

Regional Pest Management Plan for Taranaki

the manner in which they will undertake them”. The LGA currently underpins biosecurity activities through the collection of both general and targeted rates. While planning and delivering pest management objectives could fall under the powers and duties of the LGA, accessing legislation focused on managing pests at the regional level is the most transparent and efficient approach. The Council is mandated under s11(b) of the LGA to perform the funding function, and