Your search for 'rates' returned 2163 results.

Lepper Trust Piggery Annual Report 2022-2023

Taranaki tailored monitoring programmes, while for another 96 (10%) of the consents a good level of environmental performance and compliance was achieved. A further 27 (3%) of consents monitored required improvement in their performance, while the remaining one (<1%) achieved a rating of poor. In terms of overall environmental and compliance performance by the consent holder over the last several years, this report shows that the consent holder’s performance remains at a high level in the year

Application form CURRENT Part B Land use use of beds of lakes rivers and bores 3184084

applicable The culvert will be open-bottomed or its invert will be placed so that at least 25% of the culvert’s diameter is below the level of the bed. ☐ Yes ☐ No The bed substrate will be present over the full length of the culvert and stable at the flow rate at or below which the water flows for 80% of the time. ☐ Yes ☐ No The culvert provides for continuity of geomorphic processes (such as the movement of sediment and debris). ☐ Yes

Greymouth Petroleum Deep Well Injection Annual Report 2022-2023

one (<1%) achieved a rating of poor. In terms of overall environmental and compliance performance by the Company over the last several years, this report shows that the Company’s performance remains at a generally high level. This report includes recommendations to be implemented during the 2023-2024 monitoring period. page i Table of contents Page 1 Introduction 1 Compliance monitoring programme reports and the Resource Management Act 1991 1

Waitaha Catchment Annual Report 2022-2023

improvement in their performance, while the remaining one (<1%) achieved a rating of poor. In terms of overall environmental and compliance performance by the consent holders over the last several years, this report shows that the consent holders’ performance remains at a good level for the year under review. This report includes recommendations for the 2023-2024 year. page i Table of contents Page 1 Introduction 1 1.1 Compliance monitoring programme reports

C D Boyd Drilling Waste Land Farming Annual Report 2022-2023

decommissioning of the water treatment pond was completed with minimal disturbance and the pasture strike was good, however the soil sampling showed that contaminants remain above the consent limits in several paddocks. No rating is given for the administrative performance because there were no requirements for this year. The ratings are defined in Appendix II. For reference, in the 2022-2023 year consent holders were found to achieve a high level of environmental performance and compliance for 878

Concrete Batching Plants Annual Report 2022-2023

monitoring programmes, while for another 96 (10%) of the consents a good level of environmental performance and compliance was achieved. A further 27 (3%) of consents monitored required improvement in their performance, while the remaining one (<1%) achieved a rating of poor. This report includes recommendations for the 2023-2024 year. page page i Table of contents Page 1 Introduction 1 Compliance monitoring programme reports and the

Hickman J D 1997 Family Trust Annual Report 2022-2023

consents a good level of environmental performance and compliance was achieved. A further 27 (3%) of consents monitored required improvement in their performance, while the remaining one (<1%) achieved a rating of poor. In terms of overall environmental and compliance performance by the consent holder over the last several years, this report shows that the consent holder’s performance has improved since the previous year’s review. This report includes recommendations for the 2023-2024

STDC Hawera Municipal Oxidation Ponds Annual Report 2022-2023

achieved a rating of poor. In terms of overall environmental and compliance performance by the consent holder over the last several years, this report shows that the consent holder’s performance remained at a high level in the year under review. This report includes recommendations for the 2023-2024 year. page i Table of contents Page 1 Introduction 1 Compliance monitoring programme reports and the Resource Management Act 1991 1 1.1.1 Introduction 1