Publicly notified consents

Information on current resource consent applications that have been publicly notified:

Ōpunake Power Ltd

Ōpunake Power Ltd has applied to renew seven resource consents and for one new consent, relating to the operation of the Opunake Hydroelectric Power Scheme located adjacent to the Opunake township.

Public submissions closed on 14 April 2020. 

Public notice - Opunake Power Ltd consent applications [PDF, 96 KB](external link)

Expand the headings to view and download documentation relating to this application, and submissions that have been received:

Remediation (NZ) Ltd

The Taranaki Regional Council has received an application to renew resource consents to discharge waste material, treated stormwater & leachate, and to discharge emissions into the air from composting operations. The applicant is Remediation (NZ) Ltd.

Expand the headings to inspect/download the applications and related documentation:

Updated application information - June 2020

Revised Assessment of Environmental Effects (AEE) - June 2020 [PDF, 4.1 MB]

Appendix A - title & property [PDF, 1.6 MB]

Appendix B - existing consents [PDF, 2.7 MB]

Appendix C - Integrated Management System [PDF, 1.2 MB]

Appendix D - Site Practices Plan [PDF, 1 MB]

Appendix E - Wetlands Treatment System Management Plan [PDF, 1 MB]

Stormwater channels [PDF, 413 KB]

Appendix F - Leachate & Stormwater Management Plan [PDF, 1.4 MB]

Irrigation model [PDF, 465 KB]

SWPI irrigation (revision A May 2020) [PDF, 1.3 MB]

Appendix G - Release of Final Product protocols [PDF, 1.8 MB]

April 2018 compost results [PDF, 4.4 MB]

January 2020 compost results [PDF, 75 KB]

Appendix H - Composting Facility Management Plan [PDF, 869 KB]

Appendix I - Groundwater, Soil & Stream Monitoring Plan [PDF, 2 MB]

Appendix J - organic composting protocols (vermiculture only) [PDF, 709 KB]

Appendix K - Landscaping Plan [PDF, 2 MB]

Riparian Planting Plan [PDF, 497 KB]

Appendix L - Environmental & Safety Management Plan [PDF, 1.6 MB]

Appendix M - Waste Acceptance Plan [PDF, 1013 KB]

Appendix N - Site Reinstatement (Exit) Plan [PDF, 241 KB]

Appendix O - Farm Environmental Management Plan [PDF, 1.8 MB]

Appendix P - Petroleum hydrocarbon contaminated site guidelines [PDF, 224 KB]

Appendix Q - plan of irrigation blocks [PDF, 354 KB]

Appendix R - drilling mud sample results [PDF, 1.6 MB]

Appendix S - Assessment of Cultural Effects [PDF, 1.9 MB]

Appendix T - process diagram [PDF, 363 KB]

Appendix U - Haehanga Catchment preliminary groundwater investigation [PDF, 6.1 MB]

Appendix V - letter to neighbours [PDF, 32 KB]

Appendix W - Haehanga-Mimitangiatua confluence test results [PDF, 865 KB]

Appendix X - sampling data summaries [PDF, 3.2 MB]

Fish survey & biomonitoring report [PDF, 1.9 MB]

Appendix Y - Assessment of odour effect [PDF, 2.2 MB]

Appendix Z - Uruti Composting Facility nitrogen balance [PDF, 1.6 MB]

Appendix AA - irrigation block nitrogen analysis [PDF, 3.9 MB]

Appendix AB - irrigating high- & low-risk soils on the Uruti site [PDF, 1.2 MB]

Further information (superseded)

Presentation to TRC October 2018 [PDF, 12 MB]

Reponse to request for further information [PDF, 127 KB]

Revised Assessment of Environmental Effects (August 2018) [PDF, 4.6 MB]

Appendix C - Uruti Waste Acceptance Plan [PDF, 3.9 MB]

Appendix D - Uruti Site Practices Plan [PDF, 906 KB]

Appendix E - Uruti Wetlands Treatment System Management Plan [PDF, 991 KB]

Appendix E - Map of Stormwater channels [PDF, 413 KB]

Appendix F - Uruti Leachate & Stormwater Management Plan [PDF, 1.7 MB]

Appendix F - Irrigation model [PDF, 885 KB]

Revised irrigation model [PDF, 140 KB]

Appendix G - Uruti Release-of-Final-Product protocols [PDF, 491 KB]

Appendix H - Results of testing of final product (Hills Laboratories) - 1 [PDF, 214 KB]

Appendix H - Results of testing of final product (Hills Laboratories) - 2 [PDF, 59 KB]

Appendix H - MfE guidelines for petroleum hydrocarbon contaminated sites [PDF, 91 KB]

Appendix I - Haehanga catchment preliminary groundwater investigations [PDF, 3.2 MB]

Appendix J - Uruti Composting Facility Management Plan [PDF, 869 KB]

Appendix K - Groundwater, Soil & Stream Monitoring Plan [PDF, 2.7 MB]

Appendix L - Landscaping Plan [PDF, 205 KB]

Appendix L - Riparian Planting Plan [PDF, 2.4 MB]

Appendix M - Uruti site photo - 1 [PDF, 527 KB]

Appendix M - Uruti site photo - 2 [PDF, 5.3 MB]

Appendix N - Uruti process diagram [PDF, 363 KB]

Appendix O - Drilling mud sample results [PDF, 156 KB]

Appendix R - Remediation (NZ) Ltd organic composting protocols [PDF, 1.6 MB]

Appendix S - Assessment of cultural effects [PDF, 729 KB]

Appendix T - Uruti Integrated Management System [PDF, 2.3 MB]

Appendix U - Uruti Site Reinstatement (Exit) Plan [PDF, 241 KB]

Appendix V - Consultation records [PDF, 32 KB]

Appendix W - Haehanga-Mimitangiatua confluence test results [PDF, 865 KB]

Appendix X - Sampling data/graphs [PDF, 3.3 MB]